Back to kitchen remodel contractors
Paradise Construction
- Based in
- Brentwood
- On San Francisco permits
- Jun 2014 to May 2016
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2016 | Never finaled issued May 2016, no final | 270 Henry St | unit # 102: replace kitchen cabinets, undercabinet lights; and sink. kitchen countertop is not included in this permit.Details
unit # 102: replace kitchen cabinets, undercabinet lights; and sink. kitchen countertop is not included in this permit. | $6,000 |
| Mar 8, 2016 | Completed final sign-off Sep 2016 | 1100 Union St | #500: remodel one kitchen, laundry and three bathrooms.Details
#500: remodel one kitchen, laundry and three bathrooms. | $25,000 |
| Jan 13, 2016 | Completed final sign-off Jul 2016 | 163 Precita Av | update kitchen electrical.cover exposed opening where electrical cables get installed.revision to 201512185534; relocate range gas valve one foot to the right of existing.Details
update kitchen electrical.cover exposed opening where electrical cables get installed.revision to 201512185534; relocate range gas valve one foot to the right of existing. | $15,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2016 | 163 Precita Av | in the bathroom by the kitchen, remove (e) 2'-8" 10'h partition wall dividing the vanity and tub area. relocate (e) elect j-box by vanity centered to the mirror. change (e) siungle vanity to double sink.Details
in the bathroom by the kitchen, remove (e) 2'-8" 10'h partition wall dividing the vanity and tub area. relocate (e) elect j-box by vanity centered to the mirror. change (e) siungle vanity to double sink. | $15,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 325 China Basin St | removal of kitchen and bathrooms counter tops & installation of new ones. removal of faucets and stove top & installation of same existing ones. removal of non bearing pony wall, wall does not exceed 42" in total heights. removal of electrical plates in kitchen & replace with same existing. removalDetails
removal of kitchen and bathrooms counter tops & installation of new ones. removal of faucets and stove top & installation of same existing ones. removal of non bearing pony wall, wall does not exceed 42" in total heights. removal of electrical plates in kitchen & replace with same existing. removal | $8,230 |