Back to kitchen remodel contractors
Pao Yin Construction
- Based in
- Daly City
- On San Francisco permits
- Feb 2008 to Aug 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 64 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2015 | Completed final sign-off Nov 2015 | 210 Galewood Cr | kitchen, 2 full bathrooms, 1/2 bathroom remodel and relocate light fixtures in living room. replace with new cabinet, sink, stove same location in the kitchen. replace shower and tub same location in the bathroom.Details
kitchen, 2 full bathrooms, 1/2 bathroom remodel and relocate light fixtures in living room. replace with new cabinet, sink, stove same location in the kitchen. replace shower and tub same location in the bathroom. | $52,000 |
| Feb 27, 2008 | Completed final sign-off Mar 2008 | 1 Olympia Wy | comply with nov 200845894: remodel kitchen upstairs and (e) living spaces downstairs in a single family dwelling, paint, change carpet.Details
comply with nov 200845894: remodel kitchen upstairs and (e) living spaces downstairs in a single family dwelling, paint, change carpet. | $20,000 |