Pallari Construction General Contracting
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Sep 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 10 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 in progress. Typically 190 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2026 | In progress filed Mar 2026, not yet issued | 154 San Pablo Av | construct deck at rear , off ground level and main level. not connected with stairs. approved w signed letters by neighbors.Details
construct deck at rear , off ground level and main level. not connected with stairs. approved w signed letters by neighbors. | $40,000 |
| Dec 13, 2021 | Completed final sign-off Mar 2023 | 166 Springfield Dr | interior alteration to (e)sfd.consist of kitchen remodel,(n)exterior windows & door. new(e) deck at rear yard @ 2nd fl level.height of deck surface is 6'-8" above grade with height of guardrail 10'-2"Details
interior alteration to (e)sfd.consist of kitchen remodel,(n)exterior windows & door. new(e) deck at rear yard @ 2nd fl level.height of deck surface is 6'-8" above grade with height of guardrail 10'-2" | $95,000 |