Back to bathroom remodel contractors
Pallari Construction General Contracting
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Sep 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 10 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 5 completed, 2 in progress, 1 never finaled. Typically 2 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2026 | In progress issued Mar 2026 | 154 San Pablo Av | renovating 3 bathrooms, creating a half bath,kitchen, updating electrical & cleaning up plumbing during bathroom remodels.Details
renovating 3 bathrooms, creating a half bath,kitchen, updating electrical & cleaning up plumbing during bathroom remodels. | $300,000 |
| Nov 20, 2025 | Completed final sign-off Sep 2026 | 139 Garcia Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). installing gas line. | $100,000 |
| Nov 7, 2023 | Completed final sign-off Nov 2024 | 85 Eastwood Dr | remodel (e) kitchen, remodel/reconfigure (e) bath to create new ensuite bath & walk-in closet, remodel/reconfigure (e) hall closet to create new full bath.Details
remodel (e) kitchen, remodel/reconfigure (e) bath to create new ensuite bath & walk-in closet, remodel/reconfigure (e) hall closet to create new full bath. | $85,000 |
| Aug 28, 2023 | In progress issued Dec 2023 | 18 30th St | repair fire damage per complaint 202304937. return 1st and 2nd floor in kind. rebuilt kitchens & bathrooms. new sheetrock in two units.Details
repair fire damage per complaint 202304937. return 1st and 2nd floor in kind. rebuilt kitchens & bathrooms. new sheetrock in two units. | $100,000 |
| Jan 20, 2023 | Completed final sign-off Aug 2023 | 1056 Page St | interior alteration to e condo. no change in floor area or expansion. add new bathroom. new shower, lavatory, water closet. new closet in primary bedroom. skylight.Details
interior alteration to e condo. no change in floor area or expansion. add new bathroom. new shower, lavatory, water closet. new closet in primary bedroom. skylight. | $50,000 |
| Dec 19, 2022 | Completed final sign-off May 2024 | 3138 Moraga St | revision to permit #202109077888. reduction of scope from (2) bath to (1) bath, double patio door to single door.Details
revision to permit #202109077888. reduction of scope from (2) bath to (1) bath, double patio door to single door. | |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 418 College Av | interior remodeling of a single dwelling house to: add a bathroom and one bedroom @ 1st floor.Details
interior remodeling of a single dwelling house to: add a bathroom and one bedroom @ 1st floor. | $20,000 |
| Apr 2, 2019 | Completed final sign-off Sep 2019 | 95 Warren Dr | remodel 1 kitchen and 2 bathroom. no wall to be modified. no alteration of wall, window or door.Details
remodel 1 kitchen and 2 bathroom. no wall to be modified. no alteration of wall, window or door. | $45,000 |