Back to bathroom remodel contractors
Pacific Thunder
- Based in
- Redwood City
- On San Francisco permits
- Jun 2001 to Aug 2017
- Last 24 months
- 0 permits filed
23 permits since 2000: 17 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2014 | Completed final sign-off Mar 2014 | 4315 19th St | to comply with physical inspection report #cc7346 and legalize kitchen and bath remodel for unit #4317Details
to comply with physical inspection report #cc7346 and legalize kitchen and bath remodel for unit #4317 | $20,000 |
| May 20, 2013 | Completed final sign-off Oct 2013 | 1190 Sacramento St | remodel two bathrooms.Details
remodel two bathrooms. | $35,000 |
| Jan 30, 2006 | Completed final sign-off Mar 2006 | 156 Corbett Av | bathroom remodel. no walls moved. no structural work. new tile, new sharer valve installed. bath fan installed, provide fluorescant light fixture.Details
bathroom remodel. no walls moved. no structural work. new tile, new sharer valve installed. bath fan installed, provide fluorescant light fixture. | $5,425 |
| Dec 13, 2005 | Completed final sign-off Feb 2006 | 1644 Baker St | bathroom remodel at 3rd floor/new lights/new light fixtures on extg circuits in bdrmDetails
bathroom remodel at 3rd floor/new lights/new light fixtures on extg circuits in bdrm | $15,000 |
| Jun 14, 2005 | Expired or cancelled expired Feb 2006 | 24 Hill St | kitchen remodel, retile bathroom.Details
kitchen remodel, retile bathroom. | $12,000 |
| Oct 6, 2004 | Completed final sign-off Feb 2005 | 951 Church St | bathroom remodel relocate sink, changing tub to shower, relocate gfci, relocate lights, installDetails
bathroom remodel relocate sink, changing tub to shower, relocate gfci, relocate lights, install | $8,000 |
| Dec 17, 2002 | Completed final sign-off Sep 2003 | 1190 Sacramento St | interior remodel:2 new bathrooms, 1 new kitchen all new doors & moldings. new electrical & plumbingDetails
interior remodel:2 new bathrooms, 1 new kitchen all new doors & moldings. new electrical & plumbing | $125,000 |
| Jul 8, 2002 | Expired or cancelled expired Sep 2003 | 1190 Sacramento St | master bath remodel: new shaver (where tub used to be installed. new sink (replaces old sink). new tDetails
master bath remodel: new shaver (where tub used to be installed. new sink (replaces old sink). new t | $20,000 |