Back to bathroom remodel contractors
Pacific General Elec Co
- Based in
- San Francisco
- On San Francisco permits
- May 2003 to Oct 2012
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2006 | Completed final sign-off Jun 2006 | 254 Roosevelt Wy | (unit# 4 only). install new electrical wiring in bathroom. install new plumbing & relocate bath tub in bathroom. install new drywall & insullation in bathroom. (bathroom area only). install new floor with new tile in bathroom on 3rd floor.Details
(unit# 4 only). install new electrical wiring in bathroom. install new plumbing & relocate bath tub in bathroom. install new drywall & insullation in bathroom. (bathroom area only). install new floor with new tile in bathroom on 3rd floor. | $18,000 |