Back to kitchen remodel contractors
Pacific Dream Home Builders
- Based in
- Los Gatos
- On San Francisco permits
- Feb 2008 to Feb 2008
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 2 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2008 | Completed final sign-off Jul 2008 | 2008 15th Av | remove 2 non bearing walls, remove existing kitchen cabinets. install new cabinets and appliances, upgrade to 200 amps, replace 2 windows with new same size @ kitchen area.Details
remove 2 non bearing walls, remove existing kitchen cabinets. install new cabinets and appliances, upgrade to 200 amps, replace 2 windows with new same size @ kitchen area. | $43,000 |