Pacific Construction & Mfg.
- Based in
- Burlingame
- On San Francisco permits
- Jul 2000 to Nov 2013
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 34 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2010 | Completed final sign-off Apr 2010 | 233 Grant Av | interior tenant improvement with some demolition of (e) non-structural walls & also (e) convinience stair modification, n(n) finishes, millwork, lighting & hvac system at ground floor level only. (e) basement, 3rd. 4th. 5th. & 6th. floors to remain as is.Details
interior tenant improvement with some demolition of (e) non-structural walls & also (e) convinience stair modification, n(n) finishes, millwork, lighting & hvac system at ground floor level only. (e) basement, 3rd. 4th. 5th. & 6th. floors to remain as is. | $350,000 |
| Mar 26, 2001 | Completed final sign-off Feb 2002 | 2390 Market St | revise 9920010 and 200101311043: redesign light plan & electrical, grand staircase & structural,havcDetails
revise 9920010 and 200101311043: redesign light plan & electrical, grand staircase & structural,havc | $100 |