Back to kitchen remodel contractors
Pacific Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2024 to Aug 2026
- Last 24 months
- 12 permits filed
15 permits since 2000: 13 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 30 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2026 | Completed final sign-off Apr 2026 | 2015 Judah St | top floor -upgrade kitchen like to like same layout, upgrade fixtures. upgrade bathroom like to like layout, upgrade fixtures. no removal of wallsDetails
top floor -upgrade kitchen like to like same layout, upgrade fixtures. upgrade bathroom like to like layout, upgrade fixtures. no removal of walls | $35,815 |
| Jul 11, 2025 | Completed final sign-off Jun 2026 | 300 Yerba Buena Av | remodel 2 bathrooms and 1 kitchen. upgrade electrical wires around work and upgrade panel. replace exhaust frame in bathrooms and kitchen. new skylight, replace skylight (invisible from st)Details
remodel 2 bathrooms and 1 kitchen. upgrade electrical wires around work and upgrade panel. replace exhaust frame in bathrooms and kitchen. new skylight, replace skylight (invisible from st) | $100,000 |