Pacific Coast Construction
- Based in
- Los Angeles
- On San Francisco permits
- Aug 2011 to Aug 2011
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 1 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2011 | Completed final sign-off Sep 2011 | 2339 Market St | replacement cabinet, toilet, vanity, varnish floor paint & re-glaze bath, tub. upgrade electrical power. lighting to comply with cec 150(k). comply with nov #201109483 dated 4/6/2011.Details
replacement cabinet, toilet, vanity, varnish floor paint & re-glaze bath, tub. upgrade electrical power. lighting to comply with cec 150(k). comply with nov #201109483 dated 4/6/2011. | $16,748 |
| Aug 9, 2011 | Completed final sign-off Sep 2011 | 735 Ofarrell St | work in two units #21 & #43. work included replace kitchen cabinet, toilet, bathrroom sink, varnish hardwood floor, fix one window in living room, paint and re-glaze bath tub. lighting to comply with cec 150 (k).Details
work in two units #21 & #43. work included replace kitchen cabinet, toilet, bathrroom sink, varnish hardwood floor, fix one window in living room, paint and re-glaze bath tub. lighting to comply with cec 150 (k). | $17,678 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 1025 Sutter St | #404 replacement of kitchen cabinet, toilet, bathroom sink, varnish hardwood floor, fix 1 window in bathroom, paint and re-glaze bathtub. kitchen: min. 50% of light wattage to be h.e.; bath: h.e. light or "manual on" o.s.Details
#404 replacement of kitchen cabinet, toilet, bathroom sink, varnish hardwood floor, fix 1 window in bathroom, paint and re-glaze bathtub. kitchen: min. 50% of light wattage to be h.e.; bath: h.e. light or "manual on" o.s. | $17,535 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 828 Jones St | replacement of kitchen cabinet, toilet, vanity. varnish floor, paint, & reglaze bath-tub. upgrade electrical power. lighting to comply with cec 150 (k)Details
replacement of kitchen cabinet, toilet, vanity. varnish floor, paint, & reglaze bath-tub. upgrade electrical power. lighting to comply with cec 150 (k) | $16,948 |