Back to kitchen remodel contractors
Pacific Coast Construction
- Based in
- Richmond
- On San Francisco permits
- Jul 2001 to Jun 2008
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2008 | Completed final sign-off Mar 2009 | 77 Cuvier St | remove soffitt above kitchen cabinets. replace counter tops. modify (e) cabinets for dishwasher. rewire kitchen counter areas to 2007 cec.Details
remove soffitt above kitchen cabinets. replace counter tops. modify (e) cabinets for dishwasher. rewire kitchen counter areas to 2007 cec. | $7,000 |
| Jul 2, 2001 | Completed final sign-off Aug 2001 | 2436 Clay St | remove lower kitchen cabinets,relocate plumbing into wall. move water heater 5" into pantry area.insDetails
remove lower kitchen cabinets,relocate plumbing into wall. move water heater 5" into pantry area.ins | $8,000 |