Back to bathroom remodel contractors
Pacific Baldwin Construction, Inc
- Based in
- Burlingame
- On San Francisco permits
- Sep 2015 to Mar 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 114 days from filing to permit and 4 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2021 | Completed final sign-off Apr 2021 | 3179 Cesar Chavez St | rev pa201604043856.1/f add 1 utility room.reduce size of existing sliding door & install 2 fixed windows at living room.add 1 window at dining.relocate fireplace.relocate master closet door & reconfig jack & jill bath layout.replace bath pocket doors to swing.elim common door at atrium.Details
rev pa201604043856.1/f add 1 utility room.reduce size of existing sliding door & install 2 fixed windows at living room.add 1 window at dining.relocate fireplace.relocate master closet door & reconfig jack & jill bath layout.replace bath pocket doors to swing.elim common door at atrium. | $1,000 |
| Sep 23, 2015 | Never finaled issued Apr 2016, no final | 130 Clearfield Dr | rear horizontal 2-story addition. 1st fl: add 2 bedrooms & 1 bathroom. 2nd fl: add 2 bedrooms & 1 bathroom. remodel (e) bathroom.Details
rear horizontal 2-story addition. 1st fl: add 2 bedrooms & 1 bathroom. 2nd fl: add 2 bedrooms & 1 bathroom. remodel (e) bathroom. | $80,000 |