Block 5503, lot 022
3179 Cesar Chavez St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 8 bedrooms, 6 bathrooms
- Building
- 5,060 sq ft
- Lot
- 4,634 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2021 | Completed final sign-off Apr 2021 | 3179 Cesar Chavez St | Pacific Baldwin Construction, Inc | rev pa201604043856.1/f add 1 utility room.reduce size of existing sliding door & install 2 fixed windows at living room.add 1 window at dining.relocate fireplace.relocate master closet door & reconfig jack & jill bath layout.replace bath pocket doors to swing.elim common door at atrium.Details
rev pa201604043856.1/f add 1 utility room.reduce size of existing sliding door & install 2 fixed windows at living room.add 1 window at dining.relocate fireplace.relocate master closet door & reconfig jack & jill bath layout.replace bath pocket doors to swing.elim common door at atrium. | $1,000 |
| Oct 24, 2020 | Completed final sign-off Apr 2021 | 3179 Cesar Chavez St | Pacific Baldwin Construction, Inc | revision to bpa #201604043856 - 1st fl: add one utility room @ garage,reduce size of sliding door @ living room. add one window @ dining room. relocate fire place per plan. 3rd fl: eliminate one window @ living room, add one powder room & fire place. reduce size of skylight above (n) powder roomDetails
revision to bpa #201604043856 - 1st fl: add one utility room @ garage,reduce size of sliding door @ living room. add one window @ dining room. relocate fire place per plan. 3rd fl: eliminate one window @ living room, add one powder room & fire place. reduce size of skylight above (n) powder room | $15,000 |
| Sep 19, 2020 | Expired or cancelled withdrawn Apr 2021 | 3179 Cesar Chavez St | revision to pa# 201604043856. 1st fl: add one utility room at garage, reduce size of sliding door at living room, add one window at dining room, relocate fire place per plan. 3rd fl: eliminate one window at living room, add one powder room & fire place, reduce size of skylight above (n) powder room.Details
revision to pa# 201604043856. 1st fl: add one utility room at garage, reduce size of sliding door at living room, add one window at dining room, relocate fire place per plan. 3rd fl: eliminate one window at living room, add one powder room & fire place, reduce size of skylight above (n) powder room. | ||
| Sep 2, 2020 | Completed final sign-off Apr 2021 | 3179 Cesar Chavez St | Poly-On Security System Inc. | install fire alarm communication unit to monitor fire sprinkler system under pa# 201909121445 per sffd ab4.11. sprinkler water flow and supervisory system per nfpa 72-2019 section 23.8.5.5.1Details
install fire alarm communication unit to monitor fire sprinkler system under pa# 201909121445 per sffd ab4.11. sprinkler water flow and supervisory system per nfpa 72-2019 section 23.8.5.5.1 | $3,800 |
| Aug 8, 2020 | Never finaled issued Aug 2020, no final | 3179 Cesar Chavez St | per pa #201604043856, add address for ne adu at block 5503, lot 022 as; 3179a cesar chavez street.Details
per pa #201604043856, add address for ne adu at block 5503, lot 022 as; 3179a cesar chavez street. | ||
| Jun 8, 2020 | Never finaled issued Jun 2020, no final | 3179 Cesar Chavez St | street spaceDetails
street space | ||
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 3179 Cesar Chavez St | street spaceDetails
street space | ||
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 3179 Cesar Chavez St | street spaceDetails
street space | ||
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 3179 Cesar Chavez St | street spaceDetails
street space | ||
| Mar 6, 2019 | Completed final sign-off Oct 2020 | 3179 Cesar Chavez St | Best Care Fire Protection | install new fire sprinkler system per nfpa 13r throughout, included 2" underground fire service, total 57 heads. ref pa#201604043856Details
install new fire sprinkler system per nfpa 13r throughout, included 2" underground fire service, total 57 heads. ref pa#201604043856 | $25,000 |
| Mar 5, 2019 | Never finaled issued Mar 2019, no final | 3179 Cesar Chavez St | street spaceDetails
street space | ||
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 3179 Cesar Chavez St | street spaceDetails
street space | ||
| Apr 4, 2016 | Completed final sign-off Apr 2021 | 3179 Cesar Chavez St | Pacific Baldwin Construction, Inc | convert single-family to 2-family dwelling; horizontal addition into rearyard, complete imterior remodel, addition of 3-car garage & bicyle parking, partial removal of roof, (n) nfpa13r fire-sprinklers throughout (under separate permit).Details
convert single-family to 2-family dwelling; horizontal addition into rearyard, complete imterior remodel, addition of 3-car garage & bicyle parking, partial removal of roof, (n) nfpa13r fire-sprinklers throughout (under separate permit). | $661,814 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pacific Baldwin Construction, Inc (3), Best Care Fire Protection, Poly-On Security System Inc.
- Architects
- John Git Hoong Lum
- Engineers
- Jeff Chow (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.