P Power Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Jan 2015 to Sep 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 69 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2018 | Completed final sign-off Nov 2018 | 899 Bryant St | replace in-kind loe e glass steel sash with true divided lite windows, replace in-kind rear alley stair and handrail, and interior improvements; no other exterior work. replace 1 bath fan, replace lights with high efficacy leds throughout. replace existing generator under separate permit.Details
replace in-kind loe e glass steel sash with true divided lite windows, replace in-kind rear alley stair and handrail, and interior improvements; no other exterior work. replace 1 bath fan, replace lights with high efficacy leds throughout. replace existing generator under separate permit. | $350,000 |