Back to kitchen remodel contractors
P & L Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jun 2023
- Last 24 months
- 0 permits filed
85 permits since 2000: 72 completed, 4 never finaled, 9 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 27 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2023 | Completed final sign-off Sep 2023 | 5489 Mission St | unit #2: kitchen cabinets replacement. exterior work. cement siding cover up the existing wood siding at rear of building. in kind. approx 500 sf.Details
unit #2: kitchen cabinets replacement. exterior work. cement siding cover up the existing wood siding at rear of building. in kind. approx 500 sf. | $32,000 |
| Jan 31, 2022 | Completed final sign-off Feb 2022 | 105 Vienna St | to comply with his complaint 202286236. repair window hardware in rear bedroom due to water damage. repire kitchen ceiling due to water damage.Details
to comply with his complaint 202286236. repair window hardware in rear bedroom due to water damage. repire kitchen ceiling due to water damage. | $200 |
| May 6, 2019 | Completed final sign-off Dec 2019 | 52 Rudden Av | replace (e) permimeter foundation. replace windows, install insulation in exterior walls on 2nd flr, kitchen and bath remodel on 2nd flrDetails
replace (e) permimeter foundation. replace windows, install insulation in exterior walls on 2nd flr, kitchen and bath remodel on 2nd flr | $15,000 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 3407 24th St | unit 12: kitchen cabinets replacement and replace one toilet, one vanity in bathroom. new electrical plugs in bedroom.Details
unit 12: kitchen cabinets replacement and replace one toilet, one vanity in bathroom. new electrical plugs in bedroom. | $10,000 |
| Jul 3, 2015 | Completed final sign-off Jul 2016 | 3720 21st St | change of use for single family to 2 family dwelling. add additional unit per ordinance #49-14, add stove to the kitchen and additional countertop area.Details
change of use for single family to 2 family dwelling. add additional unit per ordinance #49-14, add stove to the kitchen and additional countertop area. | $3,000 |
| May 5, 2015 | Completed final sign-off Dec 2015 | 763 Dartmouth St | 1)remodel kitchen and one bath room at 2nd floor. 2)construct one new bath room at ground floor. 3) construct new deck at rear of bldg. (size approx 16'-9"x8'-0").Details
1)remodel kitchen and one bath room at 2nd floor. 2)construct one new bath room at ground floor. 3) construct new deck at rear of bldg. (size approx 16'-9"x8'-0"). | $38,000 |
| Apr 21, 2015 | Completed final sign-off Apr 2016 | 522 Lawton St | 1)remodel extg kitchen, bathroom, & construct one new bathroom at 2nd floor. 2)convert extg family room into 2 bedroom. construct one new full bath room. laundry area at ground floor.Details
1)remodel extg kitchen, bathroom, & construct one new bathroom at 2nd floor. 2)convert extg family room into 2 bedroom. construct one new full bath room. laundry area at ground floor. | $58,000 |
| Mar 25, 2015 | Completed final sign-off Jun 2015 | 1333 Grant Av | kitchen and bathroom remodel; to comply with cec150.0(k)3 & 5Details
kitchen and bathroom remodel; to comply with cec150.0(k)3 & 5 | $20,000 |
| Dec 8, 2014 | Completed final sign-off Jan 2015 | 423 34th Av | #3, #4- replace kitchen cabinets, sinks. remodel bathroom, replace bathtub, vanity, toilet & tile.Details
#3, #4- replace kitchen cabinets, sinks. remodel bathroom, replace bathtub, vanity, toilet & tile. | $20,000 |
| Nov 12, 2013 | Completed final sign-off Mar 2014 | 1510 Portola Dr | kitchen remodel. remove all wall cover. new sheetrock cover wall & ceiling new cabinets, appliances, subpanel for kitchen, new light, new counter top.Details
kitchen remodel. remove all wall cover. new sheetrock cover wall & ceiling new cabinets, appliances, subpanel for kitchen, new light, new counter top. | $6,000 |
| Aug 19, 2013 | Completed final sign-off Dec 2013 | 100 Avalon Av | replace kitchen cabinets, sheet rock in walls, ceiling in kitchen, replace all bathroom fixtures, sheetrock in wall & ceiling at second floor bathroom.Details
replace kitchen cabinets, sheet rock in walls, ceiling in kitchen, replace all bathroom fixtures, sheetrock in wall & ceiling at second floor bathroom. | $10,000 |
| Dec 11, 2012 | Completed final sign-off May 2013 | 691 Edinburgh St | in 1st floor: remodel (e) space to have famil room, a bath, a bedroom & a storage. in 2nd floor: relocate kitchen, bath, add a bath.Details
in 1st floor: remodel (e) space to have famil room, a bath, a bedroom & a storage. in 2nd floor: relocate kitchen, bath, add a bath. | $45,000 |
| Nov 13, 2012 | Completed final sign-off Oct 2013 | 18 Auburn St | install new kitchen and bathroom cabinets. install new floor/wal tiles in kitchen, bathroom, living room and hallway. replace windows as indicated, install 1 new window, repair or replace sheetrock and dryrot. install new kitchen and bathroom fixtures. install furnace, install new electrical work asDetails
install new kitchen and bathroom cabinets. install new floor/wal tiles in kitchen, bathroom, living room and hallway. replace windows as indicated, install 1 new window, repair or replace sheetrock and dryrot. install new kitchen and bathroom fixtures. install furnace, install new electrical work as | $50,000 |
| Apr 13, 2011 | Completed final sign-off Jun 2011 | 1223 Silver Av | interior remodell relocate kitchen/ at 2nd floor. legalize half bath at ground flo0r.Details
interior remodell relocate kitchen/ at 2nd floor. legalize half bath at ground flo0r. | $10,000 |
| Mar 24, 2011 | Completed final sign-off Jun 2011 | 1223 Silver Av | kitchen cabinet replacement @ 2/f and comply withn ov 199928389 repair/provide roof drainage per code.Details
kitchen cabinet replacement @ 2/f and comply withn ov 199928389 repair/provide roof drainage per code. | $5,000 |
| Oct 20, 2010 | Completed final sign-off Jan 2011 | 290 Gellert Dr | kitchen cabinets replacement, no structural work, new lighting comply w/cec 150(k)Details
kitchen cabinets replacement, no structural work, new lighting comply w/cec 150(k) | $12,000 |
| May 28, 2010 | Completed final sign-off Jul 2010 | 1511 09th Av | unit #3: kitchen remodel, new sheet rock in ceiling and some wall, new vanity in bathroomDetails
unit #3: kitchen remodel, new sheet rock in ceiling and some wall, new vanity in bathroom | $5,000 |
| Jan 4, 2010 | Completed final sign-off Apr 2010 | 1 Huntington Dr | to comply with complaints# 2009.29862.remodel kitchen and 2 bathrooms in top floor. install new lights in 3 bedrooms, living, dining room and kitchen.Details
to comply with complaints# 2009.29862.remodel kitchen and 2 bathrooms in top floor. install new lights in 3 bedrooms, living, dining room and kitchen. | $28,000 |
| Jun 17, 2009 | Never finaled issued Jun 2009, no final | 401 Ralston St | add $7000 for work at kitchen for pa# 2009/04/09/5902.Details
add $7000 for work at kitchen for pa# 2009/04/09/5902. | $7,000 |
| May 13, 2009 | Completed final sign-off Jul 2009 | 3407 24th St | work @ apt# 8 only. replacement kitchen cabinets.Details
work @ apt# 8 only. replacement kitchen cabinets. | $11,400 |
| Feb 27, 2009 | Completed final sign-off Apr 2009 | 875 Sacramento St | work @ unit# 401 only. remodeling bathroom and kitchen cabinets replacement.Details
work @ unit# 401 only. remodeling bathroom and kitchen cabinets replacement. | $12,000 |
| Nov 10, 2008 | Completed final sign-off Dec 2008 | 1511 09th Av | work @ unit# 2 only. kitchen cabinets replacement. no moving wall.Details
work @ unit# 2 only. kitchen cabinets replacement. no moving wall. | $5,000 |
| Apr 4, 2008 | Completed final sign-off May 2008 | 3407 24th St | apartment #20. need replace kitchen cabinets. no change window door or exterior.Details
apartment #20. need replace kitchen cabinets. no change window door or exterior. | $7,000 |
| Mar 30, 2006 | Completed final sign-off Apr 2006 | 622 09th Av | (work at unit# 622 only). kitchen cabinets replacement. remodel 1 kitchen. no structural work.Details
(work at unit# 622 only). kitchen cabinets replacement. remodel 1 kitchen. no structural work. | $7,154 |
| Jul 6, 2005 | Completed final sign-off Aug 2005 | 990 Florida St | remodel kitchen & bathroom. sheetrock on (e) wall at 990 florida st. all new shingle will be 5/8"Details
remodel kitchen & bathroom. sheetrock on (e) wall at 990 florida st. all new shingle will be 5/8" | $20,000 |
| Sep 30, 2004 | Expired or cancelled expired Mar 2021 | 1267 11th Av | kitchen cabinets replacement at apt 1Details
kitchen cabinets replacement at apt 1 | $4,000 |
| Aug 12, 2003 | Completed final sign-off Oct 2003 | 5489 Mission St | replaced kitchen cabinets at apartment#1. no structural work.Details
replaced kitchen cabinets at apartment#1. no structural work. | $6,000 |
| Feb 11, 2003 | Completed final sign-off Mar 2003 | 1053 Oak St | replace kitchen cabinets in unit #100. replace 1 window in bathroom and 1 inDetails
replace kitchen cabinets in unit #100. replace 1 window in bathroom and 1 in | $1,500 |
| Aug 3, 2000 | Completed final sign-off Nov 2000 | 2322 27th Av | replace kitchen cabinets, replace windows and sliding doorDetails
replace kitchen cabinets, replace windows and sliding door | $11,000 |