Back to kitchen remodel contractors
P C Building And Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2019 to Apr 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 35 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2024 | Completed final sign-off Jul 2024 | 2890 California St | unit 105: one kitchen replace in kind: cabinets, counters, and appliances. add dishwasher- one bathroom, bathtub replace with shower and tiles. replace existing subpanel.Details
unit 105: one kitchen replace in kind: cabinets, counters, and appliances. add dishwasher- one bathroom, bathtub replace with shower and tiles. replace existing subpanel. | $30,000 |
| Nov 2, 2021 | Completed final sign-off May 2022 | 2651 20th Av | rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower.Details
rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower. | $10,000 |
| Jul 22, 2021 | Completed final sign-off Jul 2022 | 960 Bay St | unit 6: interior remodel. new partition wall to create a new bedroom, new egress windows. new bath at existing living room, new kitchen layout and kitchen cabinet to be replaced.Details
unit 6: interior remodel. new partition wall to create a new bedroom, new egress windows. new bath at existing living room, new kitchen layout and kitchen cabinet to be replaced. | $40,000 |