Back to kitchen remodel contractors
Outa H2o Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2002 to Jan 2022
- Last 24 months
- 0 permits filed
29 permits since 2000: 25 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2022 | Expired or cancelled expired Dec 2024 | 2390 Hyde St | kitchen remodel-remove (e) cabinets and fixtures. replace with in-kind. refinishes or replace floors. replace lighting fixtures througout. remodel (e) bathrooms (3-1/2). replace (e) built-in cabinets with in kind cabinets througout apt.Details
kitchen remodel-remove (e) cabinets and fixtures. replace with in-kind. refinishes or replace floors. replace lighting fixtures througout. remodel (e) bathrooms (3-1/2). replace (e) built-in cabinets with in kind cabinets througout apt. | $85,000 |
| May 29, 2020 | Completed final sign-off Apr 2021 | 175 Bluxome St | partial remodeling of kitchen and bathroom. new vanity, toilet and bath. new cabinets, counter tops and appliances. all work in-kindDetails
partial remodeling of kitchen and bathroom. new vanity, toilet and bath. new cabinets, counter tops and appliances. all work in-kind | $25,000 |
| Jan 10, 2019 | Completed final sign-off Apr 2020 | 758 30th Av | convert and enlarge the extg study at rear of ground floor into a 1 bedroom second unit. construct a sleeping area, kitchen and bathroom. enclose garage with one hour rated seperation.Details
convert and enlarge the extg study at rear of ground floor into a 1 bedroom second unit. construct a sleeping area, kitchen and bathroom. enclose garage with one hour rated seperation. | $80,000 |
| Oct 1, 2012 | Completed final sign-off May 2013 | 3111 Buchanan St | install new bathroom in existing closet and utility space per attached drawings. remodel existing bathroom. remodel existing kitchen new cabinets and counter tops. no structural workDetails
install new bathroom in existing closet and utility space per attached drawings. remodel existing bathroom. remodel existing kitchen new cabinets and counter tops. no structural work | $27,000 |
| Dec 18, 2008 | Completed final sign-off Dec 2009 | 120 25th Av | enlarge entry into e pantry at rear, center door opening, infill e opening in wall between kitchen and dining room, new opening between kitchen and dining rmDetails
enlarge entry into e pantry at rear, center door opening, infill e opening in wall between kitchen and dining room, new opening between kitchen and dining rm | $8,000 |
| Nov 23, 2005 | Completed final sign-off May 2006 | 2900 Scott St | 1 kitchen, 1 bath remodel. replace vanity, 1 cabinet. all appliances and fixtures.refinish hardwood floors.repair/replace damaged plaster ceiling. instulate wall and ceiling where possible throughout 1 unit. 1/3 plstr removal masx of bldgDetails
1 kitchen, 1 bath remodel. replace vanity, 1 cabinet. all appliances and fixtures.refinish hardwood floors.repair/replace damaged plaster ceiling. instulate wall and ceiling where possible throughout 1 unit. 1/3 plstr removal masx of bldg | $32,000 |
| Jul 8, 2005 | Completed final sign-off Jan 2006 | 768 Church St | kitchen remodel. remove (e) cabinets & appliances. repair / replace damaged walls & ceiling lath &Details
kitchen remodel. remove (e) cabinets & appliances. repair / replace damaged walls & ceiling lath & | $32,000 |
| Apr 25, 2005 | Completed final sign-off Oct 2005 | 76 Saturn St | remodel e kitchen. remove exi cabinet. redo floors, repair damage to walls and ceilings. repair exisDetails
remodel e kitchen. remove exi cabinet. redo floors, repair damage to walls and ceilings. repair exis | $18,800 |
| Dec 10, 2004 | Never finaled issued Dec 2004, no final | 76 Saturn St | remodel kitchen & bath.repair damaged plaster where needed.replace rotten & molded lumber if needed.Details
remodel kitchen & bath.repair damaged plaster where needed.replace rotten & molded lumber if needed. | $12,000 |
| Apr 16, 2003 | Completed final sign-off Oct 2003 | 220 03rd Av | kitchen & bathrm remodel,utility rm remodel repair/replace damaged lath & plaster ceiling & wallsDetails
kitchen & bathrm remodel,utility rm remodel repair/replace damaged lath & plaster ceiling & walls | $18,000 |