Back to kitchen remodel contractors
Ot Bay Builders Inc.
- Based in
- San Jose
- On San Francisco permits
- Mar 2018 to Jul 2026
- Last 24 months
- 10 permits filed
39 permits since 2000: 26 completed, 10 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | In progress issued Sep 2026 | 1658 Chestnut St | interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor.Details
interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor. | $170,000 |
| Sep 5, 2024 | In progress issued Nov 2025 | 80 Crown Tr | 1) remodel kitchen in kind. 2) remodel (2) existing baths. 3) replace (4) windows in-kindDetails
1) remodel kitchen in kind. 2) remodel (2) existing baths. 3) replace (4) windows in-kind | $60,000 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 2185 Bush St | existing kitchen area remodel 116 sq ft remodel to include new cabinet appliances and layout, new pantry, laundry access. 2nd fl area remodel at 6' sq ft including new vanity toilet and shower. 1st fl bathroom remodelDetails
existing kitchen area remodel 116 sq ft remodel to include new cabinet appliances and layout, new pantry, laundry access. 2nd fl area remodel at 6' sq ft including new vanity toilet and shower. 1st fl bathroom remodel | $50,000 |
| Apr 2, 2024 | Completed final sign-off Jan 2025 | 577 Vienna St | 1st fl provide (n) wetbar and (n) recessed lighting 2nd fl remodel (e) kitchen and new lighting. new skylightDetails
1st fl provide (n) wetbar and (n) recessed lighting 2nd fl remodel (e) kitchen and new lighting. new skylight | $68,000 |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 295 Mangels Av | drywall reapir in the kitchen area behind (e) cabinets + bath ceiling. counter top replacement + sink. replace and install recessed lights + switches througout the house, run new power for 2 lights in garage. install 120 sqft tile flooring, add new fan to existing bathroom.Details
drywall reapir in the kitchen area behind (e) cabinets + bath ceiling. counter top replacement + sink. replace and install recessed lights + switches througout the house, run new power for 2 lights in garage. install 120 sqft tile flooring, add new fan to existing bathroom. | $10,000 |
| Sep 7, 2023 | Completed final sign-off Aug 2024 | 2603 Sacramento St | renovation kitchen and bath - relocating bath to other side of kitchen to open space. will be removing bath wall. will be adhering to all ca codes and upgrading elecrical and plumbing to meet energy efficent standards.Details
renovation kitchen and bath - relocating bath to other side of kitchen to open space. will be removing bath wall. will be adhering to all ca codes and upgrading elecrical and plumbing to meet energy efficent standards. | $37,000 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 2555 Leavenworth St | bath & kitchen remodel no changes like for like. unit 105Details
bath & kitchen remodel no changes like for like. unit 105 | $23,000 |
| May 23, 2023 | Completed final sign-off Dec 2023 | 326 23rd Av | kitchen remodel like for like.Details
kitchen remodel like for like. | $30,000 |
| Apr 17, 2023 | Completed final sign-off May 2024 | 1545 Broadway | unit 304: interior renovation, remodel kitchen & (2) bathrooms, remove closet doors/create wardrobe closets, add recessed lighting throughoutDetails
unit 304: interior renovation, remodel kitchen & (2) bathrooms, remove closet doors/create wardrobe closets, add recessed lighting throughout | $40,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |