Back to kitchen remodel contractors
Ordway Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Dec 2005 to Feb 2026
- Last 24 months
- 2 permits filed
27 permits since 2000: 15 completed, 2 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 567 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 1418 48th Av | remove existing kitchen dining room wall & install new strutural wood beam to support ceiling & roofDetails
remove existing kitchen dining room wall & install new strutural wood beam to support ceiling & roof | $7,000 |
| Oct 31, 2013 | Completed final sign-off Feb 2014 | 2734 Bush St | remodel bathrooms including replace shower valves & drains. upgrade electrical in bathrooms & kitchen to current codes, replace tile & sinks. (e) exhaust to remainDetails
remodel bathrooms including replace shower valves & drains. upgrade electrical in bathrooms & kitchen to current codes, replace tile & sinks. (e) exhaust to remain | $27,111 |
| Sep 6, 2011 | Completed final sign-off Mar 2013 | 31 San Pablo Av | replace kitchen cabinets & appliances like to like in the same area, upgrade plumbing & electrical to current codes. no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy - cec 150(k)8Details
replace kitchen cabinets & appliances like to like in the same area, upgrade plumbing & electrical to current codes. no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy - cec 150(k)8 | $18,000 |
| Oct 4, 2010 | Completed final sign-off Jun 2018 | 1260 De Haro St | remove bearing wall between kitchen & living, add 1 bathroom & 1 laundry room. kitchen & bathroom remodeling.Details
remove bearing wall between kitchen & living, add 1 bathroom & 1 laundry room. kitchen & bathroom remodeling. | $40,000 |
| Aug 19, 2010 | Completed final sign-off Jun 2018 | 1262 De Haro St | remodel kitchen. remove existing cabinets & appliance w/ new cabinets & appliances.Details
remodel kitchen. remove existing cabinets & appliance w/ new cabinets & appliances. | $15,000 |
| Apr 29, 2009 | Completed final sign-off Nov 2009 | 1434 31st Av | replace existing kitchen cabinets and appliances with new in same locationDetails
replace existing kitchen cabinets and appliances with new in same location | $20,000 |
| Dec 27, 2005 | Expired or cancelled expired Dec 2010 | 2012 Baker St | remodel kitchen & bathroom. update plumbing & electrical.Details
remodel kitchen & bathroom. update plumbing & electrical. | $50,000 |