Back to kitchen remodel contractors
Opticomp Construction
- Based in
- Foster City
- On San Francisco permits
- Nov 2009 to Feb 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 4 days from filing to permit and 401 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2009 | Completed final sign-off Dec 2010 | 1575 La Salle Av | remove illegal kitchen at lower/garage level. remove (e) lath and plaster at lower/garage level to upgrade wiring & insulation. replace 3 windows. remodel (e) shower at lower/ garage level. repair dry rot in (e) bathroom floor above including ceiling in garage level.Details
remove illegal kitchen at lower/garage level. remove (e) lath and plaster at lower/garage level to upgrade wiring & insulation. replace 3 windows. remodel (e) shower at lower/ garage level. repair dry rot in (e) bathroom floor above including ceiling in garage level. | $18,000 |