Back to bathroom remodel contractors
One Inch To The Left, Inc. Dba Rarefield
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Mar 2026
- Last 24 months
- 5 permits filed
80 permits since 2000: 72 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 2 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2024 | Completed final sign-off May 2025 | 324 Pacheco St | in-kind window replacement in bedroom, media room, bathroom & hallway at side & rear of bldg, not visible from st. same size, same locations, max u-factor 0.30; 4 total windows.Details
in-kind window replacement in bedroom, media room, bathroom & hallway at side & rear of bldg, not visible from st. same size, same locations, max u-factor 0.30; 4 total windows. | $20,000 |
| Sep 20, 2023 | Completed final sign-off Feb 2024 | 4107 21st St | upstairs bathroom remodel replace in kindDetails
upstairs bathroom remodel replace in kind | $65,000 |
| Aug 23, 2022 | Completed final sign-off Jul 2023 | 119 Maddux Av | downstairs bathroom fixtures to be replaced. vanity, flooring tiles, shower, and toilet.Details
downstairs bathroom fixtures to be replaced. vanity, flooring tiles, shower, and toilet. | $30,000 |
| Aug 23, 2022 | Completed final sign-off Jul 2023 | 119 Maddux Av | bathroom remodel on second floor: partition wall to be removed and setback 1', bathroom fixtures to be updated. finishes to be updated.Details
bathroom remodel on second floor: partition wall to be removed and setback 1', bathroom fixtures to be updated. finishes to be updated. | $45,000 |
| Jan 5, 2017 | Completed final sign-off Apr 2017 | 5325 California St | replace all fixts. & finishes in-kind for (2) bathrooms located on 2nd fl. replace outlet in (e) locations. reconnect plumbing to fixts in (e) locations.Details
replace all fixts. & finishes in-kind for (2) bathrooms located on 2nd fl. replace outlet in (e) locations. reconnect plumbing to fixts in (e) locations. | $25,000 |
| Aug 8, 2013 | Completed final sign-off Nov 2013 | 628 20th St | remodel interior, new retail counter, new equipment, new ada bathroom and new lighting. ground floor only.Details
remodel interior, new retail counter, new equipment, new ada bathroom and new lighting. ground floor only. | $50,000 |