Back to kitchen remodel contractors
Olson Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Feb 2016
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 119 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2016 | Completed final sign-off Jan 2017 | 600 03rd St | replace cabinet at bar, replace damaged grill and oven, replace damaged bar top, replace damaged floor at kitchen and bar with new coved tile, add floor drains in kitchen and bar, replace damaged exterior light fixtures replace damaged hood skirt. to clear nov 201691221. maher not req.Details
replace cabinet at bar, replace damaged grill and oven, replace damaged bar top, replace damaged floor at kitchen and bar with new coved tile, add floor drains in kitchen and bar, replace damaged exterior light fixtures replace damaged hood skirt. to clear nov 201691221. maher not req. | $6,000 |