Back to kitchen remodel contractors
Olson And Son
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Nov 2015
- Last 24 months
- 0 permits filed
26 permits since 2000: 18 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2007 | Completed final sign-off Jun 2008 | 52 Tioga Av | repair damage caused by fire . non structure. replace siding, flooring, kitchen cabinets, drywall. replace damaged windows.Details
repair damage caused by fire . non structure. replace siding, flooring, kitchen cabinets, drywall. replace damaged windows. | $32,000 |
| Sep 30, 2004 | Completed final sign-off Feb 2005 | 108 Gold Mine Dr | replace existing front deck per plans. remodel kitchen, up grade plumbing and electical per codeDetails
replace existing front deck per plans. remodel kitchen, up grade plumbing and electical per code | $18,000 |
| Sep 2, 2003 | Completed final sign-off Dec 2003 | 946 Stockton St | remodel bathroom (new sink, toilet, tile surround tub), open 2 pass through in kitchenDetails
remodel bathroom (new sink, toilet, tile surround tub), open 2 pass through in kitchen | $9,000 |
| Jul 22, 2003 | Completed final sign-off Jan 2004 | 180 Huntington Dr | remodel upper bathroom & kitchenDetails
remodel upper bathroom & kitchen | $18,000 |