Ojv Construction * See Notes*
- Based in
- San Jose
- On San Francisco permits
- May 2011 to May 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 132 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2011 | Never finaled issued Oct 2011, no final | 3137 Mission St | retrofit of extg corridor exit for 2nd and 3rd floor residential units. work to be limitted to repair/replace sheet rock, extg corridor lights. exit signs. repair/replace doors,hardware and signage. comply with nov #201078467 and 201078467. new stairs at rear.Details
retrofit of extg corridor exit for 2nd and 3rd floor residential units. work to be limitted to repair/replace sheet rock, extg corridor lights. exit signs. repair/replace doors,hardware and signage. comply with nov #201078467 and 201078467. new stairs at rear. | $15,000 |