Oceana Construction
- Based in
- Burlingame
- On San Francisco permits
- Aug 2001 to Apr 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2016 | Never finaled issued Apr 2016, no final | 7623 Geary Bl | replace water damaged wood rear exit stairway. replace stairs, risers, framing etc as need less than 50% repair work.Details
replace water damaged wood rear exit stairway. replace stairs, risers, framing etc as need less than 50% repair work. | $15,000 |