Back to kitchen remodel contractors
Ocean Air Heating
- Based in
- San Francisco
- On San Francisco permits
- Sep 2012 to Oct 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 15 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 8 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2025 | Completed final sign-off Oct 2025 | 141 Dorado Tr | replace existing kitchen hood ducting. run approx. 15' of new 26 guage sheet metal ducting.Details
replace existing kitchen hood ducting. run approx. 15' of new 26 guage sheet metal ducting. | $900 |