Oakstone Construction Inc.
- Based in
- Placerville
- On San Francisco permits
- Jun 2006 to Oct 2022
- Last 24 months
- 0 permits filed
35 permits since 2000: 29 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 80 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2013 | Completed final sign-off Sep 2013 | 333 Jefferson St | unit b105. remove stairway to mezzinine and close off mezzinine occupancy, modify exist entry doors to swing into space. new lay-in ceiling, new drywall partition, new hvac, plumbing, lighting finishes. (soft demo under seperate permit.)Details
unit b105. remove stairway to mezzinine and close off mezzinine occupancy, modify exist entry doors to swing into space. new lay-in ceiling, new drywall partition, new hvac, plumbing, lighting finishes. (soft demo under seperate permit.) | $150,000 |
| Aug 3, 2012 | Completed final sign-off May 2013 | 851 Beach St | storage room: repair finishes, provide new flooring, rebuild stairs from sales area. storage room roofing: remove e skylight and roofing provide new framing at skylight location and new roofing. storefront: remove louvered glass and replace tempered glass in e sales area, new wall base, patch,repairDetails
storage room: repair finishes, provide new flooring, rebuild stairs from sales area. storage room roofing: remove e skylight and roofing provide new framing at skylight location and new roofing. storefront: remove louvered glass and replace tempered glass in e sales area, new wall base, patch,repair | $36,000 |