Back to kitchen remodel contractors
O Valley Construction
- Based in
- San Leandro
- On San Francisco permits
- Jan 2013 to Oct 2025
- Last 24 months
- 1 permit filed
9 permits since 2000: 6 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 193 days from filing to permit and 1010 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2013 | Completed final sign-off May 2016 | 910 Rhode Island St | for both units #910 & 912 - alternate existing floor layout included removing & constructing interior walls, new light fixture & outlets, new bathroom. remodel (e) kitchen & bathroom for unit #912 only.Details
for both units #910 & 912 - alternate existing floor layout included removing & constructing interior walls, new light fixture & outlets, new bathroom. remodel (e) kitchen & bathroom for unit #912 only. | $48,000 |
| Feb 7, 2013 | Completed final sign-off May 2016 | 910 Rhode Island St | for unit 910 (3rd fl). alternate (e) floor lay out inclued removing & constructing interior walls. remodel (e) kitchen & bathrooms. raise roof line at dining room area & align new ceiling with (e) ceiling height. work only at the rear half of building. replace wd shingle w/ stucco. replace windows.Details
for unit 910 (3rd fl). alternate (e) floor lay out inclued removing & constructing interior walls. remodel (e) kitchen & bathrooms. raise roof line at dining room area & align new ceiling with (e) ceiling height. work only at the rear half of building. replace wd shingle w/ stucco. replace windows. | $30,000 |