Back to kitchen remodel contractors
O'conaire Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 27 permits filed
93 permits since 2000: 80 completed, 9 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 never finaled. Typically 6 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2025 | Completed final sign-off Dec 2025 | 3847 17th St | kitchen remodel in kind. like for like.Details
kitchen remodel in kind. like for like. | $15,000 |
| Aug 23, 2022 | Completed final sign-off May 2025 | 4201 Lawton St | 1st floor: expand (e) garage & entry. 2nd floor: reconfigure (e) spaces, remodel kitchen & bath, add 2 decks. 3rd floor: expand (e) bedroom, add 2 bedrooms, 2 baths, laundry & roof deck. (e) roofline to be reconfigured.Details
1st floor: expand (e) garage & entry. 2nd floor: reconfigure (e) spaces, remodel kitchen & bath, add 2 decks. 3rd floor: expand (e) bedroom, add 2 bedrooms, 2 baths, laundry & roof deck. (e) roofline to be reconfigured. | $400,000 |
| Feb 28, 2022 | Completed final sign-off Sep 2022 | 416 Vallejo St | bathroom and kitchen remodel on the top floor replace everything in kind.Details
bathroom and kitchen remodel on the top floor replace everything in kind. | $40,000 |
| Dec 30, 2021 | Completed final sign-off Jul 2022 | 1918 22nd Av | 2/f: kitchen remodel. partial removal of load bearing wall between living/kitchen. remove wall between dining/kitchen. 1/f: (2) structural posts & foundations.Details
2/f: kitchen remodel. partial removal of load bearing wall between living/kitchen. remove wall between dining/kitchen. 1/f: (2) structural posts & foundations. | $48,000 |
| Oct 26, 2021 | Completed final sign-off Oct 2022 | 1958 Bush St | work at lower level unit & crawl space only, remove wall between kitchen/living, kitchen, remodel rear popout structure, dry rot repair of wall studs, replace strip font 2 gl c/4-5,b-c/5;(2) pad frg @ gl b/4-5 replace (7) fad ftg c crawl space any additional font replacement may require soils reportDetails
work at lower level unit & crawl space only, remove wall between kitchen/living, kitchen, remodel rear popout structure, dry rot repair of wall studs, replace strip font 2 gl c/4-5,b-c/5;(2) pad frg @ gl b/4-5 replace (7) fad ftg c crawl space any additional font replacement may require soils report | $58,000 |
| Jan 15, 2021 | Completed final sign-off Dec 2021 | 238 Granville Wy | revision to no plan pa# 202012090577: 1st fl convert garage space to living space. add bedroom, bath, office & laundry rooms. reconfigure interior stairs. 2nd fl: reconfigure walls. remodel (e) bath & kitchen. add bath. replace windows. upgrade m.e.p.Details
revision to no plan pa# 202012090577: 1st fl convert garage space to living space. add bedroom, bath, office & laundry rooms. reconfigure interior stairs. 2nd fl: reconfigure walls. remodel (e) bath & kitchen. add bath. replace windows. upgrade m.e.p. | $115,000 |
| Dec 9, 2020 | Completed final sign-off Dec 2021 | 238 Granville Wy | full bathroom and kitchen remodel with light demo work to do in both bedrooms, living room and dining room for electrician to do electrical all up to codeDetails
full bathroom and kitchen remodel with light demo work to do in both bedrooms, living room and dining room for electrician to do electrical all up to code | $20,000 |
| Nov 30, 2020 | Completed final sign-off Dec 2021 | 3645 Santiago St | reconfigure interior walls. remodel kitchen & bathroom. add half bath. add 2 windows. reconfigure (e) exterior stairs. upgrade electrical.Details
reconfigure interior walls. remodel kitchen & bathroom. add half bath. add 2 windows. reconfigure (e) exterior stairs. upgrade electrical. | $150,000 |
| Aug 20, 2020 | Completed final sign-off Apr 2021 | 635 28th St | bath and kitchen remodel replace in kindDetails
bath and kitchen remodel replace in kind | $30,000 |
| Feb 10, 2020 | Completed final sign-off Jul 2020 | 434 Lombard St | bathroom, kitchen and living room remodel. no walls affected, demolished, or constructedDetails
bathroom, kitchen and living room remodel. no walls affected, demolished, or constructed | $50,000 |
| Apr 20, 2017 | Completed final sign-off Jun 2017 | 1738 25th Av | kitchen remodel (replace in kind)Details
kitchen remodel (replace in kind) | $20,000 |
| Nov 29, 2016 | Never finaled issued Mar 2019, no final | 482 Sanchez St | remodel of upstairs and downstairs. bathrooms and kitchen, bedrooms, new rock, new interior stairs to 1st fl, replace windowsDetails
remodel of upstairs and downstairs. bathrooms and kitchen, bedrooms, new rock, new interior stairs to 1st fl, replace windows | $200,000 |