Back to bathroom remodel contractors
Novin Construction Inc
- Based in
- Walnut Creek
- On San Francisco permits
- Mar 2022 to Aug 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 10 days from filing to permit and 589 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2022 | Completed final sign-off Apr 2024 | 936 Geary St | interior residential remodel- working in 31 units total like for like replace: bath remodel (sink, toilet, vanity). replace unit entry and closet doors, refurbish hard wood floors, replace cabinets in kitchen in select units, interior paint and wall patching. re-glaze bath tubs. f/a on sep permit.Details
interior residential remodel- working in 31 units total like for like replace: bath remodel (sink, toilet, vanity). replace unit entry and closet doors, refurbish hard wood floors, replace cabinets in kitchen in select units, interior paint and wall patching. re-glaze bath tubs. f/a on sep permit. | $850,000 |