Novin Construction Inc
- Based in
- Walnut Creek
- On San Francisco permits
- Mar 2022 to Aug 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2022 | Completed final sign-off Apr 2024 | 936 Geary St | reinstate sewer line from floor level clean out to curb w/ 20 miller. remove all (e) hydronic system, cut/ cap pipe to be hidden in floor. find and repair leaks add shut off valves as needed to each unit. replace coin operated washer & dryer in laundry room to match existing. dryer cmc 908 w/shutoffDetails
reinstate sewer line from floor level clean out to curb w/ 20 miller. remove all (e) hydronic system, cut/ cap pipe to be hidden in floor. find and repair leaks add shut off valves as needed to each unit. replace coin operated washer & dryer in laundry room to match existing. dryer cmc 908 w/shutoff | $45,000 |
| Aug 22, 2022 | Completed final sign-off Apr 2024 | 936 Geary St | interior residential remodel- working in 31 units total like for like replace: bath remodel (sink, toilet, vanity). replace unit entry and closet doors, refurbish hard wood floors, replace cabinets in kitchen in select units, interior paint and wall patching. re-glaze bath tubs. f/a on sep permit.Details
interior residential remodel- working in 31 units total like for like replace: bath remodel (sink, toilet, vanity). replace unit entry and closet doors, refurbish hard wood floors, replace cabinets in kitchen in select units, interior paint and wall patching. re-glaze bath tubs. f/a on sep permit. | $850,000 |
| Mar 1, 2022 | Completed final sign-off Apr 2024 | 936 Geary St | over the counter window replacement in kind (like-for-like). 136 windows total. 66 new vinyl windows. 70 aluminum clad wood windows street facing. all windows same size, same location, max u-factor=0.58, max rshgc=0.41, min vt=0.42 fixed/0.32 operableDetails
over the counter window replacement in kind (like-for-like). 136 windows total. 66 new vinyl windows. 70 aluminum clad wood windows street facing. all windows same size, same location, max u-factor=0.58, max rshgc=0.41, min vt=0.42 fixed/0.32 operable | $132,000 |