Back to kitchen remodel contractors
Nova East Design Build Co.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2021 to Oct 2025
- Last 24 months
- 3 permits filed
8 permits since 2000: 6 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 8 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2025 | Completed final sign-off May 2026 | 42 Granada Av | 1st fl. add laundry room, 2nd fl. remodel kitchen and batth, add 1 bedroom and 1 full bath. 3rd fl. add half bath. add deck at rearDetails
1st fl. add laundry room, 2nd fl. remodel kitchen and batth, add 1 bedroom and 1 full bath. 3rd fl. add half bath. add deck at rear | $100,000 |
| Aug 15, 2024 | Completed final sign-off Jun 2025 | 112 Conrad St | 1st fl: add family room & 1 full bath 2nd fl: remodel kitchen and bath. add 1 bedroom & 1 full bath. change 2nd floor bedroom at rear of house to den. replace front window with aluminum windowsDetails
1st fl: add family room & 1 full bath 2nd fl: remodel kitchen and bath. add 1 bedroom & 1 full bath. change 2nd floor bedroom at rear of house to den. replace front window with aluminum windows | $140,000 |
| May 24, 2023 | Completed final sign-off Mar 2024 | 36 Harold Av | reconfigure bathroom & add half bath, interior remodel kitchen & baths, modify sloped ceiling.Details
reconfigure bathroom & add half bath, interior remodel kitchen & baths, modify sloped ceiling. | $40,000 |
| Sep 10, 2021 | Completed final sign-off Apr 2022 | 1627 21st Av | 2nd fl: remodel living, dining, kitchen, and bath. 1 new bath, lightwell modifications and rear infill. new rear siding. new windows at front with aluminum.Details
2nd fl: remodel living, dining, kitchen, and bath. 1 new bath, lightwell modifications and rear infill. new rear siding. new windows at front with aluminum. | $65,000 |