Back to kitchen remodel contractors
Northrup Building
- Based in
- Belmont
- On San Francisco permits
- Dec 2011 to Jun 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 1030 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2012 | Completed final sign-off Feb 2015 | 229 28th St | move kitchen sink to under window, gas range to westwall. remove and replace cabinets in kitchen, remove bathroom tub and install, new tub in same space, tile around tub. remove and reinstall new vanity with sink, new tile floor.Details
move kitchen sink to under window, gas range to westwall. remove and replace cabinets in kitchen, remove bathroom tub and install, new tub in same space, tile around tub. remove and reinstall new vanity with sink, new tile floor. | $61,000 |