Northcoast Remodeling & Construction
- Based in
- Novato
- On San Francisco permits
- Jun 2011 to Sep 2018
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 4 days from filing to permit and 660 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2014 | Completed final sign-off Oct 2017 | 1718 Baker St | remove and replace extg deck, rail and stair system at backyard. install new structural post footing per engineers drawings. replace in kind, required 2nd means of egress. same size & same location.Details
remove and replace extg deck, rail and stair system at backyard. install new structural post footing per engineers drawings. replace in kind, required 2nd means of egress. same size & same location. | $50,000 |
| May 9, 2014 | Completed final sign-off Jul 2014 | 1919 Grant Av | remove and replace extg exterior staircase(back yard). replace stringers, treads and rail to meet code compliance for condo conversion. add support for stair/deck connection extg deck to remain. like for like.Details
remove and replace extg exterior staircase(back yard). replace stringers, treads and rail to meet code compliance for condo conversion. add support for stair/deck connection extg deck to remain. like for like. | $10,000 |