North South Construction
- Based in
- San Bruno
- On San Francisco permits
- Apr 2005 to Aug 2010
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 12 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2010 | Completed final sign-off Dec 2010 | 23 Beaver St | replace (e) entry stairs in same configuration. reuse (e) railing parts & newell posts or provide new to match (e).Details
replace (e) entry stairs in same configuration. reuse (e) railing parts & newell posts or provide new to match (e). | $9,200 |
| Apr 28, 2010 | Completed final sign-off Jun 2010 | 3845 21st St | repairs to stairs to front entrance of building, replace stringers & re-use original treads where possible, less than 50%, pressure treated woodDetails
repairs to stairs to front entrance of building, replace stringers & re-use original treads where possible, less than 50%, pressure treated wood | $1,000 |