Back to bathroom remodel contractors
North Beach Const.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Mar 2016
- Last 24 months
- 0 permits filed
46 permits since 2000: 36 completed, 7 never finaled, 3 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 2 never finaled. Typically 0 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2015 | Completed final sign-off Feb 2016 | 2000 California St | work in unit 106: all fire-rated assemblies to remain intact. remodel kitchen and three bathrooms - remove cabinets and fixtures. install new cabinets, countertops - new sheetrock. remove fixtures from bathrooms - lath, tile tobe removed. install new fixtures. new tile work. no structural work.Details
work in unit 106: all fire-rated assemblies to remain intact. remodel kitchen and three bathrooms - remove cabinets and fixtures. install new cabinets, countertops - new sheetrock. remove fixtures from bathrooms - lath, tile tobe removed. install new fixtures. new tile work. no structural work. | $65,000 |
| Mar 17, 2014 | Completed final sign-off Aug 2014 | 15 Yerba Buena Av | refer to 201401216728; rear of building not visible to the street; additional permit to correct dry rot to 2nd flr north bathroom. remove stucco, sheathing and damaged framing as needed to existing walls and roofing. install new roofing approx area 8'x14";comp w/ ord 155-13 not requiredDetails
refer to 201401216728; rear of building not visible to the street; additional permit to correct dry rot to 2nd flr north bathroom. remove stucco, sheathing and damaged framing as needed to existing walls and roofing. install new roofing approx area 8'x14";comp w/ ord 155-13 not required | $20,000 |
| Jan 21, 2014 | Completed final sign-off Aug 2014 | 15 Yerba Buena Av | remodel 2 bathrooms, demo existing, insulate, sheetrock, install new fixtures, vanities, etc. no walls removed. lighting shall be comply with t-24. compliance with ordinance #155-13 not required.Details
remodel 2 bathrooms, demo existing, insulate, sheetrock, install new fixtures, vanities, etc. no walls removed. lighting shall be comply with t-24. compliance with ordinance #155-13 not required. | $30,000 |
| Oct 27, 2010 | Completed final sign-off May 2011 | 315 Castro St | repair water damaged hallway & bathroom: walls, ceiling & floors. install (n) sheetrock, tile bath flr. trim-out moldings as original details, paint. electricaal, plumbing by others. no structural work.Details
repair water damaged hallway & bathroom: walls, ceiling & floors. install (n) sheetrock, tile bath flr. trim-out moldings as original details, paint. electricaal, plumbing by others. no structural work. | $7,500 |
| Sep 28, 2009 | Completed final sign-off Mar 2010 | 338 San Jose Av | remodel kitchen & bathrm. remove wall plaster, demo kitchen cabinets & bath fixtures.install insulation new wall board, cabinets & plbg fixtures, install tile work in bath.no struct work. elect & plbg by others. provide high efficancy lights per t-24 mandatory lighting measure & exhaust fan in bathDetails
remodel kitchen & bathrm. remove wall plaster, demo kitchen cabinets & bath fixtures.install insulation new wall board, cabinets & plbg fixtures, install tile work in bath.no struct work. elect & plbg by others. provide high efficancy lights per t-24 mandatory lighting measure & exhaust fan in bath | $34,000 |
| Sep 8, 2009 | Completed final sign-off Jan 2010 | 1766 Dolores St | remove plumbing fixtures, tile, counters, sheetrock in 2 bathrooms. install new bath tub, shower cabinets and sinks in both bathrooms, sheetrock, and tile work. no structural work elec & plumbing by others.Details
remove plumbing fixtures, tile, counters, sheetrock in 2 bathrooms. install new bath tub, shower cabinets and sinks in both bathrooms, sheetrock, and tile work. no structural work elec & plumbing by others. | $20,000 |
| Oct 10, 2006 | Completed final sign-off Apr 2008 | 330 San Jose Av | remodel kchn and bathrooms in units 340 and 330 and 334. remove sheetrock, lath, plaster, remove 2 chiminey flue. e sheetrock install cbnts, in kchn. remove fixturess in bathroom. install new cbnts and pmbg fixtures tile work.Details
remodel kchn and bathrooms in units 340 and 330 and 334. remove sheetrock, lath, plaster, remove 2 chiminey flue. e sheetrock install cbnts, in kchn. remove fixturess in bathroom. install new cbnts and pmbg fixtures tile work. | $100,000 |
| Mar 1, 2006 | Completed final sign-off Sep 2006 | 1919 Sacramento St | add bathroom on third floor level. remove extg kchnette and minor faming/new lighting at bthrm floruescent or occupnacy sensor manuel on new lighting at habitable space on dimmer switch or flourescentDetails
add bathroom on third floor level. remove extg kchnette and minor faming/new lighting at bthrm floruescent or occupnacy sensor manuel on new lighting at habitable space on dimmer switch or flourescent | $35,000 |
| Jun 14, 2005 | Completed final sign-off Dec 2005 | 899 Urbano Dr | remodel existing bathroom. remove fixtures, wall and ceiling plaster, new drywall, fixtures, tile,Details
remodel existing bathroom. remove fixtures, wall and ceiling plaster, new drywall, fixtures, tile, | $14,000 |
| Jan 26, 2005 | Never finaled issued Jan 2005, no final | 1501 08th Av | kitchen & bathroom remodel unit f, no structural work to be doneDetails
kitchen & bathroom remodel unit f, no structural work to be done | $19,000 |
| Nov 10, 2004 | Never finaled issued Nov 2004, no final | 1501 08th Av | kitchen & bathroom remodel, unit#b. no structural work to be done.Details
kitchen & bathroom remodel, unit#b. no structural work to be done. | $24,000 |
| Apr 30, 2004 | Completed final sign-off Aug 2004 | 1501 08th Av | unit #d- remodel kitchen & bath.no structural work to be doneDetails
unit #d- remodel kitchen & bath.no structural work to be done | $18,000 |
| Jul 1, 2003 | Completed final sign-off Sep 2003 | 1501 08th Av | kitchen and bathroom remodel, unit #e, no structural work to be doneDetails
kitchen and bathroom remodel, unit #e, no structural work to be done | $17,000 |
| Oct 16, 2002 | Completed final sign-off Feb 2003 | 1501 08th Av | #a-remodel bathroom, remove palster, sheetrock tiles & bath fix., resheetrock, install new bath fix.Details
#a-remodel bathroom, remove palster, sheetrock tiles & bath fix., resheetrock, install new bath fix. | $14,000 |
| Feb 25, 2002 | Completed final sign-off Aug 2002 | 2301 Lake St | remodel kitchen & bathroom. new sheetrock,new cabinets,countertops,no change to configuration.Details
remodel kitchen & bathroom. new sheetrock,new cabinets,countertops,no change to configuration. | $20,000 |