Back to kitchen remodel contractors
Norman G Phillips
- Based in
- Oakley
- On San Francisco permits
- Oct 2021 to Oct 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2021 | Completed final sign-off Jan 2022 | 300 03rd St | #404 in kind one kitchen and one bathroom remodel in 900 sq ft condo on the 4th fl of building (facing 3rd) replacing current cabinets with new cabinets. no walls to be moved. square footage will remain the same. non structural.Details
#404 in kind one kitchen and one bathroom remodel in 900 sq ft condo on the 4th fl of building (facing 3rd) replacing current cabinets with new cabinets. no walls to be moved. square footage will remain the same. non structural. | $15,000 |