Norcal Pro Construction
- Based in
- Antioch
- On San Francisco permits
- Apr 2025 to Sep 2025
- Last 24 months
- 3 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2025 | Completed final sign-off Aug 2025 | 1578 Fulton St | 2 (e) decks to remove (e) subfloor and replace with new including gaco waterproof system, new tile, install (e) guardrail. remove water damage bdrm sheetrock,r/r 3 lights.install linear drain on deck.Details
2 (e) decks to remove (e) subfloor and replace with new including gaco waterproof system, new tile, install (e) guardrail. remove water damage bdrm sheetrock,r/r 3 lights.install linear drain on deck. | $15,000 |