Back to kitchen remodel contractors
Nobel Construction*See Notes*
- Based in
- San Mateo
- On San Francisco permits
- Oct 2015 to Jun 2020
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 5 never finaled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2018 | Completed final sign-off Sep 2019 | 1210 Polk St | upgrade entrance door to meet ada. new 3 compartment pot sink. new hand sink. new quarry tile floor w/quarry tile cove (kitchen area) this bld is a residential hotel. units may not be converted, demolished or have their use changed without complying with chapter 41 sf admin codeDetails
upgrade entrance door to meet ada. new 3 compartment pot sink. new hand sink. new quarry tile floor w/quarry tile cove (kitchen area) this bld is a residential hotel. units may not be converted, demolished or have their use changed without complying with chapter 41 sf admin code | $10,000 |
| Apr 26, 2018 | Never finaled issued Apr 2018, no final | 1762 La Salle Av | remove wood lath & cement finish walls - 1st floor only. replace with 5/8" sheet rock with r-13 batt insulation - first floor only. electrical l& plumbing interior /kitchen + bathroom remodel - 1st floor only.Details
remove wood lath & cement finish walls - 1st floor only. replace with 5/8" sheet rock with r-13 batt insulation - first floor only. electrical l& plumbing interior /kitchen + bathroom remodel - 1st floor only. | $8,000 |
| Feb 14, 2018 | Completed final sign-off Jan 2020 | 1771 La Salle Av | remodel kitchen and bathroom in kind. repair and / or remove and replace damaged lath & plaster/sheetrock walls & ceilings. work at unit #1773 (lower; street level unit) onlyDetails
remodel kitchen and bathroom in kind. repair and / or remove and replace damaged lath & plaster/sheetrock walls & ceilings. work at unit #1773 (lower; street level unit) only | $10,000 |
| Feb 4, 2016 | Completed final sign-off Feb 2016 | 937 Geary St | removal of bar kitchen fixtures.Details
removal of bar kitchen fixtures. | $700 |