Back to kitchen remodel contractors
Nino Company
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2024 to Aug 2026
- Last 24 months
- 5 permits filed
7 permits since 2000: 3 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 in progress. Typically 232 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Aug 2026 | 1205 Brussels St | replace kitchen cabinets, relocate gas valves, new sub panel, 7 circuits, stove hood, fridge outlets, microwave outlet, dishwasher outlets, 2 couter tops outlets, garbage dispsoal, new stove, fridge, sink, new water lines for fridge. like for like remodel, no change to floor plan.Details
replace kitchen cabinets, relocate gas valves, new sub panel, 7 circuits, stove hood, fridge outlets, microwave outlet, dishwasher outlets, 2 couter tops outlets, garbage dispsoal, new stove, fridge, sink, new water lines for fridge. like for like remodel, no change to floor plan. | $16,000 |
| Mar 19, 2024 | In progress issued Jun 2025 | 935 York St | repair all fire damage like for like. remove and replace all drywall and insulation on 2nd and 3rd floors. repair kitchen in kind. repair roof due to fire damage and repair ceiling joists at 2nd and 3rd floor at rear. replace doors and windows. replace hvac & electrical wires.Details
repair all fire damage like for like. remove and replace all drywall and insulation on 2nd and 3rd floors. repair kitchen in kind. repair roof due to fire damage and repair ceiling joists at 2nd and 3rd floor at rear. replace doors and windows. replace hvac & electrical wires. | $300,000 |