Back to bathroom remodel contractors
Nibbi Bros Assoc Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Sep 2026
- Last 24 months
- 40 permits filed
495 permits since 2000: 353 completed, 32 in progress, 88 never finaled, 22 expired or cancelled.
Of the 88 never-finaled permits, 6 are 3 to 5 years old, 33 are 5 to 10 years old, 49 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
64 bathroom remodel permits: 37 completed, 20 never finaled, 7 expired or cancelled. Typically 158 days from filing to permit and 671 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2025 | Completed final sign-off Aug 2026 | 540 Mission Bay Blvd North Bl | addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openingsDetails
addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openings | $225,000 |
| Oct 12, 2021 | Never finaled issued Dec 2021, no final | 290 Malosi St | rev to pa 201806202372. revise bathroom from bathtubs to rolling showers in units, 302a, 304a, 310a, 302b, 307b, 309b, 402a, 404a, 410a, 402b, 408b, 410b, 502a, 504a, 510a, 502b, 508b, 510b. per exception of cbc 11-b-608.4 shower seats will not be provided in residential units provided that reinforcDetails
rev to pa 201806202372. revise bathroom from bathtubs to rolling showers in units, 302a, 304a, 310a, 302b, 307b, 309b, 402a, 404a, 410a, 402b, 408b, 410b, 502a, 504a, 510a, 502b, 508b, 510b. per exception of cbc 11-b-608.4 shower seats will not be provided in residential units provided that reinforc | $10,000 |
| Feb 4, 2021 | Completed final sign-off Oct 2021 | 150 Golden Gate Av | adding 3 new unisex bathrooms & a laundry space at ground floor of existing building.Details
adding 3 new unisex bathrooms & a laundry space at ground floor of existing building. | $105,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Linden St | bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,473,000 |
| Dec 27, 2019 | Never finaled issued Jan 2021, no final | 645 Linden St | bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a.Details
bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a. | $2,130,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 500 Webster St | bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 751 Hayes St | bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,260,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Fell St | bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $3,408,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 695 Buchanan St | bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 550 Webster St | bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 1601 Lane St | revision to pa# 2019-0827-9991: revise bathroom design due to unforeseen structural condition & door access to it room. revise concrete landing outside of new door. revise signage locationDetails
revision to pa# 2019-0827-9991: revise bathroom design due to unforeseen structural condition & door access to it room. revise concrete landing outside of new door. revise signage location | |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 1601 Lane St | remodel extg office to be a child watch 'e' occupancy in this room. add child's bathroom.Details
remodel extg office to be a child watch 'e' occupancy in this room. add child's bathroom. | $80,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 410 Rose St | bldg 10. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 10. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $900,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 224 Webster St | bldg 12. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 12. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $900,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 312 Haight St | bldg 15. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 15. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $3,750,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 422 Rose St | bldg 11. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 11. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $1,800,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 301 Buchanan St | bldg 14. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 14. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $1,050,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 409 Page St | bldg 8. rad rehab work includes: (n) kitchens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 8. rad rehab work includes: (n) kitchens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $4,330,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 405 Rose St | bldg 13. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 13. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $2,850,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 323 Buchanan St | bldg 9. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 9. rad rehab work includes: (n) ktichens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $900,000 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3111 Kamille Ct | bldg 15 - 3111,3115,3117,3121,3125,3127,3131,3137,3141 kamille court.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg 15 - 3111,3115,3117,3121,3125,3127,3131,3137,3141 kamille court.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3168 Cesar Chavez St | bldg# 4:3168,3170,3172,3176,3178,3180,3182,3186,3188 cesar chavez st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply.Details
bldg# 4:3168,3170,3172,3176,3178,3180,3182,3186,3188 cesar chavez st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3165 26th St | bldg# 6:3165,3167,3169,3171,3173,3175,3181,3183,3185-26 st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg# 6:3165,3167,3169,3171,3173,3175,3181,3183,3185-26 st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 3000 Harrison St | bldg 11 - 3000,3008,3012,3016,3018,3028,3038,3040,3046,3048 harrison st. 3100 kamille ct.3101-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yDetails
bldg 11 - 3000,3008,3012,3016,3018,3028,3038,3040,3046,3048 harrison st. 3100 kamille ct.3101-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-y | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 3115 26th St | bldg#10.3111,3115,3117,3121,3125,3127,3131,3133,3141-26 street.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardwarw,hvac equip.window replacement. maher comply.Details
bldg#10.3111,3115,3117,3121,3125,3127,3131,3133,3141-26 street.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardwarw,hvac equip.window replacement. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3168 Kamille Ct | bldg# 8. 3168,3176,3178,3180,3186,3188 kamile ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,counter top,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply.Details
bldg# 8. 3168,3176,3178,3180,3186,3188 kamile ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,counter top,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3050 Harrison St | bldg 16 - 3050,3056,3060,3062,3068,3072,3076,3078,3082,3088,3090,3096,3098 harrison st.3100 cesar chavez.3101 kamille.100% afford husing bernal dwelg rad,priority process.intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,aplce,smk&carn monxde detr,lte fix,dr hardware,hvac eq.winw repl.maher-yDetails
bldg 16 - 3050,3056,3060,3062,3068,3072,3076,3078,3082,3088,3090,3096,3098 harrison st.3100 cesar chavez.3101 kamille.100% afford husing bernal dwelg rad,priority process.intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,aplce,smk&carn monxde detr,lte fix,dr hardware,hvac eq.winw repl.maher-y | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 1401 Treat Wy | bldg 14 - 1401,1415,1439,1441,1449,1453,1461,1469,1489,1491,1495,1497 treat.3148 cesar chavez.3149 kamille.100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath,cabtctrtops&rec, pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yesDetails
bldg 14 - 1401,1415,1439,1441,1449,1453,1461,1469,1489,1491,1495,1497 treat.3148 cesar chavez.3149 kamille.100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath,cabtctrtops&rec, pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yes | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Sep 2021 | 3128 Kamille Ct | bldg# 12. 3128 kamille court. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip. maher comply.Details
bldg# 12. 3128 kamille court. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip. maher comply. | $300,000 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 1300 Treat Wy | bldg# 7.1300,1328,1338,1340,1348,1368,1380,1386,1388,1398 treat wy.3155-26th st.3156 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacet. maher comply.Details
bldg# 7.1300,1328,1338,1340,1348,1368,1380,1386,1388,1398 treat wy.3155-26th st.3156 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath, cabtctrtops&rec,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacet. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3161 Kamille Ct | bldg 2:3161,3165,3169,3171,3175,3177,3183,3185,3189 kamille ct. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip.winw repl.maher comply.Details
bldg 2:3161,3165,3169,3171,3175,3177,3183,3185,3189 kamille ct. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardward,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 1400 Treat Wy | bldg 3:1400,1418,1438,1440,1448,1452,1460,1468,1488,1490,1496,1498 treat 3150 cesar chavez st.3151 kamile ct,100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yesDetails
bldg 3:1400,1418,1438,1440,1448,1452,1460,1468,1488,1490,1496,1498 treat 3150 cesar chavez st.3151 kamile ct,100% afford husing bernal dwelg rad,priority process,intr altern,kitch,bath, cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher-yes | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3118 Cesar Chavez St | bldg 17 - 3118,3120,3122,3126,3128,3130,3132,3136,3138 cesar chavez st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg 17 - 3118,3120,3122,3126,3128,3130,3132,3136,3138 cesar chavez st. 100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Dec 3, 2018 | Never finaled issued May 2019, no final | 3138 Kamille Ct | bldg# 13. 3138,3140 kamille court.100% afford husing bernal welg, rad,priority process,scope for intr altern, kitch, bath,cabinet, countertops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply.Details
bldg# 13. 3138,3140 kamille court.100% afford husing bernal welg, rad,priority process,scope for intr altern, kitch, bath,cabinet, countertops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replacement. maher comply. | $100,000 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 1301 Treat Wy | bldg# 9.1301,1327,1337,1341,1349,1369,1381,1385,1389,1399 treat.3148 kamille ct.3149-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replt.maher comply.Details
bldg# 9.1301,1327,1337,1341,1349,1369,1381,1385,1389,1399 treat.3148 kamille ct.3149-26th st.100% afford husing bernal dwelg rad,priority process,scope for intr altern, kitch, bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.window replt.maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3051 Folsom St | bldg 1:3051,3055,3059,3065,3069,3075,3077,3079,3085,3095 folsom st,3197 kamille ct,3198 cesar chavez.100% afford husing bernal dwelg rad,priority process,scope:intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply.Details
bldg 1:3051,3055,3059,3065,3069,3075,3077,3079,3085,3095 folsom st,3197 kamille ct,3198 cesar chavez.100% afford husing bernal dwelg rad,priority process,scope:intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl. maher comply. | $1,864,510 |
| Dec 3, 2018 | Completed final sign-off Jul 2021 | 3001 Folsom St | bldg# 5:3001,3007,3021,3023,3025,3031,3035,3037,3045,3049 folsom st.3195-26th st. 3198 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply.Details
bldg# 5:3001,3007,3021,3023,3025,3031,3035,3037,3045,3049 folsom st.3195-26th st. 3198 kamille ct.100% afford husing bernal dwelg rad,priority process,scope for intr altern,kitch,bath,cabtctrtops&rec,pnt&flrg,plmb fix,applce,smk&carn monxde detr,lte fix,dr hardware,hvac equip.winw repl.maher comply. | $1,864,510 |
| Jun 15, 2018 | Completed final sign-off Oct 2019 | 2700 Arelious Walker Dr | priority plan review. revisions to pa # 201401166475. mod field review comments regarding acces compliance to residential units: 230, 229, 228 & 227. work includes walkway in unit entry doors, modifications to kitchen & bathrooms. maher n/aDetails
priority plan review. revisions to pa # 201401166475. mod field review comments regarding acces compliance to residential units: 230, 229, 228 & 227. work includes walkway in unit entry doors, modifications to kitchen & bathrooms. maher n/a | |
| Jun 14, 2018 | Completed final sign-off Oct 2019 | 2600 Arelious Walker Dr | priority plan review. revision to pa # 201401166470. addressing m.o.d field review comments regarding access compliance to residential units: 202, 203, 204 and 205. includes exterior walkways, unit entry door, modifications to kitchens & bathrooms. maher n/aDetails
priority plan review. revision to pa # 201401166470. addressing m.o.d field review comments regarding access compliance to residential units: 202, 203, 204 and 205. includes exterior walkways, unit entry door, modifications to kitchens & bathrooms. maher n/a | |
| May 21, 2018 | Completed final sign-off Aug 2019 | 2500 Arelious Walker Dr | revision required to address mod field review. units 201, 202, 204 & 205. revision includes unit entry door from exterior walkway, modification to kitchen & bathrooms. revision to 2015-0123-6565-s1/r1.Details
revision required to address mod field review. units 201, 202, 204 & 205. revision includes unit entry door from exterior walkway, modification to kitchen & bathrooms. revision to 2015-0123-6565-s1/r1. | $3,000 |
| Apr 11, 2017 | Expired or cancelled withdrawn Apr 2019 | 1400 Baker St | b-3 - revision to pa #201511051902: lounge space is converted to maintenance room & addition of unisex toilet to maintenance room @ b-3 (rad) basement. add exterior door & exhaust louver for bathroom.Details
b-3 - revision to pa #201511051902: lounge space is converted to maintenance room & addition of unisex toilet to maintenance room @ b-3 (rad) basement. add exterior door & exhaust louver for bathroom. | $75,000 |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1817 Eddy St | bld 15 - rad program submittal revision to 201504305056: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 15 - rad program submittal revision to 201504305056: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1841 Eddy St | bld 14 - rad program submittal revision to 201504305046: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 14 - rad program submittal revision to 201504305046: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1746 Turk St | bld 20 - rad program submittal revision to 201504305058: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 20 - rad program submittal revision to 201504305058: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1151 Scott St | bld 17 - rad program submittal revision to 201504305037: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 17 - rad program submittal revision to 201504305037: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1111 Scott St | bld 18 - rad program submittal revision to 201504305057: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 18 - rad program submittal revision to 201504305057: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1770 Turk St | bldg 21 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bldg 21 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1865 Eddy St | bldg. 13 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bldg. 13 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1157 Scott St | bld 16 - rad program submittal revision to 201504305036: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 16 - rad program submittal revision to 201504305036: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1722 Turk St | bld 19 - rad program submittal revision to 201504305038: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 19 - rad program submittal revision to 201504305038: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1151 Scott St | bldg 17. rad program submittal.moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1151, 1153, 1155 scott st.Details
bldg 17. rad program submittal.moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1151, 1153, 1155 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1157 Scott St | bldg 16.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit.1157,1159,1161,1163,1165,1167,1169,1171,1173,1175,1177,1179 scott st.Details
bldg 16.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit.1157,1159,1161,1163,1165,1167,1169,1171,1173,1175,1177,1179 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1140 Scott St | bldg 10. rad program submittal. modernization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replace.fire sprinkler under separate permit. 1140, 1142 1144 1146 scott st.Details
bldg 10. rad program submittal. modernization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replace.fire sprinkler under separate permit. 1140, 1142 1144 1146 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2017 | 1867 Eddy St | bldg 13. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1867, 1871, 1873, 1875, 1865, 1869 eddy st.Details
bldg 13. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1867, 1871, 1873, 1875, 1865, 1869 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2016 | 1644 Turk St | bldg 7. rad prog submittal.modernize units inclu kitchens, bathrooms, lighting&finishes. reconfigure 1 unit for accessibility.fire sprinkler under sep permit. 1644,1646,1648,1650,1652,1654,1656,1658,1660,1662,1664,1666 turk st.Details
bldg 7. rad prog submittal.modernize units inclu kitchens, bathrooms, lighting&finishes. reconfigure 1 unit for accessibility.fire sprinkler under sep permit. 1644,1646,1648,1650,1652,1654,1656,1658,1660,1662,1664,1666 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2017 | 1841 Eddy St | bldg 14. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring two units for accessibility. fire sprinkler under separate permit. 1841,1843,1845,1847,1849,1851,1853,1855,1857,1859,1861,1863 eddy st.Details
bldg 14. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring two units for accessibility. fire sprinkler under separate permit. 1841,1843,1845,1847,1849,1851,1853,1855,1857,1859,1861,1863 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Jul 2017 | 1770 Turk St | bldg 21.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1770, 1772, 1774, 1776, 1778, 1780 turk st.Details
bldg 21.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1770, 1772, 1774, 1776, 1778, 1780 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Dec 2017 | 1777 Eddy St | bldg 2. rad program submittal. moderization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1777, 1779, 1781, 1783, 1785, 1787, 1789, 1791, 1793, 1795, 1797, 1799 eddy st.Details
bldg 2. rad program submittal. moderization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1777, 1779, 1781, 1783, 1785, 1787, 1789, 1791, 1793, 1795, 1797, 1799 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1722 Turk St | bldg 19. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1722, 1724, 1726, 1728, 1730, 1732, 1734, 1736, 1738, 1740, 1742, 1744 turk st.Details
bldg 19. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1722, 1724, 1726, 1728, 1730, 1732, 1734, 1736, 1738, 1740, 1742, 1744 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Dec 2017 | 1190 Scott St | bldg 1. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1190, 1194, 1198, 1196, 1188 scott st.Details
bldg 1. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1190, 1194, 1198, 1196, 1188 scott st. | $1,087,090 |
| Jan 13, 2015 | Completed final sign-off Jul 2015 | 3298 25th St | revision to appl #2014.0519.6093: delete addition of new garage exhaust from scope of work. replace (e) bathtubs with new bathtubs. change (1) window type from horizontal slider to casement window. add electrical outlet to unit #101 bathroom. change width of entry door.Details
revision to appl #2014.0519.6093: delete addition of new garage exhaust from scope of work. replace (e) bathtubs with new bathtubs. change (1) window type from horizontal slider to casement window. add electrical outlet to unit #101 bathroom. change width of entry door. | $11,000 |
| May 19, 2014 | Completed final sign-off Aug 2015 | 3590 19th St | window replacement, shingle siding replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, replace existing boilers and plumbing fixtures.Details
window replacement, shingle siding replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, replace existing boilers and plumbing fixtures. | $3,418,000 |
| May 19, 2014 | Completed final sign-off Jul 2015 | 3298 25th St | window replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, water heater and furnace replacement, replace existing plumbing fixtures.Details
window replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, water heater and furnace replacement, replace existing plumbing fixtures. | $1,241,000 |
| May 30, 2008 | Completed final sign-off Oct 2010 | 901 Alabama St | renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work.Details
renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work. | $200,000 |