Back to kitchen remodel contractors
Nextech Security Solutions
- Based in
- San Romon
- On San Francisco permits
- Sep 2017 to Jun 2026
- Last 24 months
- 21 permits filed
37 permits since 2000: 21 completed, 14 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress. Typically 22 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2024 | In progress issued Jun 2024 | 2919 Pine St | remodel 2nd fl to match e remodel at 1st fl. move kitchen and bath plus add 1 bathrm. remove 1 window,add bath window, shorten kitchen window. replace siding in kind, as needed, seismic upgrade to upper level.Details
remodel 2nd fl to match e remodel at 1st fl. move kitchen and bath plus add 1 bathrm. remove 1 window,add bath window, shorten kitchen window. replace siding in kind, as needed, seismic upgrade to upper level. | $95,000 |