Newly Renovated Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2025 to Feb 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 49 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2026 | Completed final sign-off Apr 2026 | 1135 Portola Dr | front stairs: repair less than 50% of entry stairs dur to dryrot,remove existinf finishes and replace compromised stairs. back stairs: dryrot repair less than 50% repair of stairs. replace interior finish at lower level room was damaged by water intrusion.Details
front stairs: repair less than 50% of entry stairs dur to dryrot,remove existinf finishes and replace compromised stairs. back stairs: dryrot repair less than 50% repair of stairs. replace interior finish at lower level room was damaged by water intrusion. | $15,000 |