Back to bathroom remodel contractors
New World General Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2014
- Last 24 months
- 0 permits filed
35 permits since 2000: 29 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2014 | Completed final sign-off Nov 2014 | 405 Clipper St | unit 2: remove kitchen chimney, repair ceiling & wall, replace kitchen cabinets & install floor tile, install 30" wall between the tub & toilet, install tile for bath walls & floor in bath, no structural work. kitchen 12'x10', bath 7'x8'.Details
unit 2: remove kitchen chimney, repair ceiling & wall, replace kitchen cabinets & install floor tile, install 30" wall between the tub & toilet, install tile for bath walls & floor in bath, no structural work. kitchen 12'x10', bath 7'x8'. | $16,000 |
| Mar 9, 2007 | Completed final sign-off Jun 2007 | 2266 Washington St | unit#6 only. repalce the tile in the bathroom. replace the cabinet for the kitchen. repair the floor. no change to existing lighting.Details
unit#6 only. repalce the tile in the bathroom. replace the cabinet for the kitchen. repair the floor. no change to existing lighting. | $10,000 |
| Nov 9, 2006 | Expired or cancelled expired Feb 2009 | 26 Pleasant St | install new full bathroom in existing closet area. bathtub, shower, sink, toilet, plumbing + electric for unit#30. /complete remodel of (2) two existing bathrooms, bathtub, 2 sinks, shower, 2 toilets, electric + plumbing upgrades. unit#26 remodel of (e) kitchen, range, refrigerator, countertops, tilDetails
install new full bathroom in existing closet area. bathtub, shower, sink, toilet, plumbing + electric for unit#30. /complete remodel of (2) two existing bathrooms, bathtub, 2 sinks, shower, 2 toilets, electric + plumbing upgrades. unit#26 remodel of (e) kitchen, range, refrigerator, countertops, til | $125,000 |
| Mar 20, 2002 | Completed final sign-off May 2002 | 3524 17th St | install sheetrock for kitchen,bathroom&livingroom.cabinet,repair front stairs&landing.in kind repairDetails
install sheetrock for kitchen,bathroom&livingroom.cabinet,repair front stairs&landing.in kind repair | $7,500 |
| Feb 5, 2001 | Completed final sign-off Mar 2001 | 272 Flood Av | replace the bathroom tile and one set sash windowDetails
replace the bathroom tile and one set sash window | $3,800 |