Back to bathroom remodel contractors
New Era Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2024 to Dec 2025
- Last 24 months
- 4 permits filed
8 permits since 2000: 5 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 in progress. Typically 0 days from filing to permit and 20 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 3101 Rivera St | replace carpet with lvp in downstairs bedroom, install bathroom fan at downstairs bathroom, electrical house panel replacement, replace hot water heater and replace exposed corroted galvanize lines at garage. *diagnose, identify & fix no hot water @ bathroom.Details
replace carpet with lvp in downstairs bedroom, install bathroom fan at downstairs bathroom, electrical house panel replacement, replace hot water heater and replace exposed corroted galvanize lines at garage. *diagnose, identify & fix no hot water @ bathroom. | $9,800 |
| Sep 30, 2024 | In progress issued Sep 2024 | 2351 34th Av | remodel 1 bathroom, 1 kitchen. all work in-kind. no structural work.Details
remodel 1 bathroom, 1 kitchen. all work in-kind. no structural work. | $28,000 |