New Era Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2024 to Dec 2025
- Last 24 months
- 4 permits filed
8 permits since 2000: 5 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | In progress filed Dec 2025, not yet issued | 16 Fairmount St | renewalDetails
renewal | |
| Jun 27, 2025 | Completed final sign-off Aug 2025 | 16 Fairmount St | replacement of east side stucco and replacement of (2) in kind windows. windows are street visible.Details
replacement of east side stucco and replacement of (2) in kind windows. windows are street visible. | $18,500 |
| Dec 18, 2024 | Completed final sign-off Jan 2025 | 380 Naglee Av | revison 202409301952- to include siding repair/replacement due to wood rot facing front of street.Details
revison 202409301952- to include siding repair/replacement due to wood rot facing front of street. | $6,500 |
| Oct 9, 2024 | Completed final sign-off Oct 2024 | 3101 Rivera St | replace carpet with lvp in downstairs bedroom, install bathroom fan at downstairs bathroom, electrical house panel replacement, replace hot water heater and replace exposed corroted galvanize lines at garage. *diagnose, identify & fix no hot water @ bathroom.Details
replace carpet with lvp in downstairs bedroom, install bathroom fan at downstairs bathroom, electrical house panel replacement, replace hot water heater and replace exposed corroted galvanize lines at garage. *diagnose, identify & fix no hot water @ bathroom. | $9,800 |
| Sep 30, 2024 | In progress issued Sep 2024 | 2351 34th Av | remodel 1 bathroom, 1 kitchen. all work in-kind. no structural work.Details
remodel 1 bathroom, 1 kitchen. all work in-kind. no structural work. | $28,000 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 380 Naglee Av | replace 24 fiberglass windows in kind in same openings. (street visible)max u-factor 0.30.Details
replace 24 fiberglass windows in kind in same openings. (street visible)max u-factor 0.30. | $24,000 |
| Jun 28, 2024 | In progress issued Nov 2024 | 16 Fairmount St | comply with nov 202423636 remove 2 street facing balconies. reframe both patio doors and replace with street facing windows. replace 2 rear window w/patio doors and install pre manufactured french balconiesDetails
comply with nov 202423636 remove 2 street facing balconies. reframe both patio doors and replace with street facing windows. replace 2 rear window w/patio doors and install pre manufactured french balconies | $10,000 |
| Mar 27, 2024 | Completed final sign-off Aug 2025 | 16 Fairmount St | stucco replacement @ front & rear of house.Details
stucco replacement @ front & rear of house. | $15,000 |