Back to kitchen remodel contractors
Nevin Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2018
- Last 24 months
- 0 permits filed
84 permits since 2000: 56 completed, 12 never finaled, 16 expired or cancelled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 8 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2012 | Never finaled issued Mar 2012, no final | 1491 Funston Av | rearrange rooms, remodel kitchen and bathroom, replace staircase. add family rooms and bedroom and 2 full bathrooms. relocate water heater and furnace. add deck and stairs per plan.Details
rearrange rooms, remodel kitchen and bathroom, replace staircase. add family rooms and bedroom and 2 full bathrooms. relocate water heater and furnace. add deck and stairs per plan. | $60,000 |
| Jul 7, 2009 | Completed final sign-off Jul 2010 | 49 Richland Av | remodel kitchen & eating area upstairs. new floor tiles, cabinets & counter. min 50% of kitchen lighting watts shall be high efficacy lightsDetails
remodel kitchen & eating area upstairs. new floor tiles, cabinets & counter. min 50% of kitchen lighting watts shall be high efficacy lights | $10,200 |
| Dec 3, 2008 | Completed final sign-off Apr 2009 | 2025 Lawton St | replace windows. 8 windows @ rear of building. new window. u factor less than 0.67 typical. remodel kitchen. bathroom. kitchen 50% of lighting wattage shall be of high efficacy lights. bath: provide high efficancy lights or occupancy sensor. (manual on)Details
replace windows. 8 windows @ rear of building. new window. u factor less than 0.67 typical. remodel kitchen. bathroom. kitchen 50% of lighting wattage shall be of high efficacy lights. bath: provide high efficancy lights or occupancy sensor. (manual on) | $54,000 |
| Sep 16, 2008 | Completed final sign-off Nov 2008 | 441 04th Av | all work to be done in unit#3 only. replace all bathroom fixture. installation of exhaust fan in bathroom. replace all kitchen cabinets, fixture,& appliances. replace all single pane aluminum windows to vinyl.Details
all work to be done in unit#3 only. replace all bathroom fixture. installation of exhaust fan in bathroom. replace all kitchen cabinets, fixture,& appliances. replace all single pane aluminum windows to vinyl. | $17,000 |
| Sep 11, 2007 | Completed final sign-off Jul 2008 | 1822 32nd Av | remodel kitchen /bath on 2nd floor. add bedroom w/ full bath on gdfl. add new deck and stairs at rear.Details
remodel kitchen /bath on 2nd floor. add bedroom w/ full bath on gdfl. add new deck and stairs at rear. | $35,000 |
| Jun 29, 2007 | Never finaled issued Jul 2007, no final | 183 Duboce Av | remodel kitchen in unit#183,#183a,#183b & #185. install in toilet rooms and bathrooms in those four units.Details
remodel kitchen in unit#183,#183a,#183b & #185. install in toilet rooms and bathrooms in those four units. | $32,000 |
| Jun 6, 2006 | Completed final sign-off Sep 2006 | 850 Powell St | replace bathroom plumbing fixture and tiles. replace kitchen cabinets, counter top and appliances, fluorescet lights only.Details
replace bathroom plumbing fixture and tiles. replace kitchen cabinets, counter top and appliances, fluorescet lights only. | $18,000 |
| Aug 12, 2005 | Completed final sign-off Jan 2006 | 117 Buena Vista Tr | replace deck board for both decks at rear 5x25. replace 2 kitchen cabinets and countertopDetails
replace deck board for both decks at rear 5x25. replace 2 kitchen cabinets and countertop | $12,500 |
| Jun 17, 2005 | Completed final sign-off Oct 2005 | 2110 28th Av | replace kitchen cabinets and counter topDetails
replace kitchen cabinets and counter top | $6,000 |
| Mar 2, 2005 | Completed final sign-off Dec 2005 | 209 18th Av | kitchen remodeling- replace sheetrock replace cabinets, and counterDetails
kitchen remodeling- replace sheetrock replace cabinets, and counter | $8,000 |
| Dec 14, 2000 | Expired or cancelled expired Aug 2001 | 491 Hill St | install drywall & in kitchen & bathroom, paint.Details
install drywall & in kitchen & bathroom, paint. | $4,200 |