Neu Haus
- Based in
- Novato
- On San Francisco permits
- Nov 2024 to Sep 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 279 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2024 | In progress issued Sep 2025 | 591 Waller St | addition of a residential elevator on the rear midblock-facing exterior corner of the building. new stair layout, and kichen remodel with new walk-in pantry space. new non-occupiable flat roof over elevator addtion.Details
addition of a residential elevator on the rear midblock-facing exterior corner of the building. new stair layout, and kichen remodel with new walk-in pantry space. new non-occupiable flat roof over elevator addtion. | $200,000 |