Back to bathroom remodel contractors
Nava Pro Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Aug 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 2 expired or cancelled. Typically 12 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 950 Harrison St | update bathroom, toilet/sink/tub. relocate lights and bedroom area; n/a maherDetails
update bathroom, toilet/sink/tub. relocate lights and bedroom area; n/a maher | $10,000 |
| Dec 2, 2016 | Completed final sign-off Mar 2017 | 950 Harrison St | refer to complaint 201648937, update kitchen: bathroom and new toilet sink, new cabinets (under cabinet light)Details
refer to complaint 201648937, update kitchen: bathroom and new toilet sink, new cabinets (under cabinet light) | $10,000 |
| Dec 1, 2016 | Completed final sign-off Aug 2017 | 3440 20th St | unit #309, 2nd flr: remodel (e) bathroom, kitchen and add washer & dryerDetails
unit #309, 2nd flr: remodel (e) bathroom, kitchen and add washer & dryer | $25,000 |
| Nov 16, 2016 | Completed final sign-off Aug 2017 | 1760 Golden Gate Av | remodel unit 2 at 2nd fl, add washer dryer, relocate existing kitchen, remodel existing bath. convert e kitchen into bedroomDetails
remodel unit 2 at 2nd fl, add washer dryer, relocate existing kitchen, remodel existing bath. convert e kitchen into bedroom | $35,000 |
| Oct 11, 2016 | Completed final sign-off Apr 2017 | 3605 20th St | unit 4, 2nd floor - remodel (e) bathroom, remodel (e) kitchen, add washer and dryer. maher naDetails
unit 4, 2nd floor - remodel (e) bathroom, remodel (e) kitchen, add washer and dryer. maher na | $30,000 |
| Oct 4, 2016 | Completed final sign-off Oct 2017 | 1240 Bush St | #2 2/f - remodel extg bathroom, remodel extg kitchen, add washer and dryer. n/a ordinance #155-13Details
#2 2/f - remodel extg bathroom, remodel extg kitchen, add washer and dryer. n/a ordinance #155-13 | $30,000 |
| Sep 22, 2016 | Completed final sign-off Mar 2017 | 3440 20th St | 2/f #114- remodel existing bathroom, remodel existing kitchen, add washer & dryer.Details
2/f #114- remodel existing bathroom, remodel existing kitchen, add washer & dryer. | $25,000 |
| Apr 28, 2016 | Expired or cancelled expired Mar 2018 | 634 Rockdale Dr | revision to pa #201601288217- 1st flr: create family room, add sink to bath, change laundry room to study. 2nd flr: remove walls at living, dining & kitchen. add new bath & closet. add window at new bath & dining area. change exist shower to closet.Details
revision to pa #201601288217- 1st flr: create family room, add sink to bath, change laundry room to study. 2nd flr: remove walls at living, dining & kitchen. add new bath & closet. add window at new bath & dining area. change exist shower to closet. | $105,000 |
| Jan 28, 2016 | Expired or cancelled expired Mar 2018 | 634 Rockdale Dr | provide new bedroom & bathroom remodel @ ground floor. voluntary seismic upgrade @ ground floor. legalized bedroom & living room @ ground floor.Details
provide new bedroom & bathroom remodel @ ground floor. voluntary seismic upgrade @ ground floor. legalized bedroom & living room @ ground floor. | $20,000 |
| Aug 22, 2014 | Completed final sign-off Jul 2015 | 609 Arguello Bl | kitchen & bathroom remodel, same location, update kitchen plugs, install cabinets, tile, install dish washer in location of previous sink, install new toilet, faucet & bath fixtures, install hook up and drain for washer/dryer adjacent to bath, cut 4'x5' pass through between kitchen & living room.Details
kitchen & bathroom remodel, same location, update kitchen plugs, install cabinets, tile, install dish washer in location of previous sink, install new toilet, faucet & bath fixtures, install hook up and drain for washer/dryer adjacent to bath, cut 4'x5' pass through between kitchen & living room. | $20,000 |