Back to kitchen remodel contractors
Nation Fidelity Const Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to May 2014
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2007 | Completed final sign-off Nov 2007 | 640 Turk St | fire damage unit. windows repoalced are in kind windows not visible from street, remodeling living room, bedroom, kitchen, bathrrom. replace cabinets and sixtures, remove all of plaster wall and ceiling do electircal upgrade, plumbing and replace plaster (not on the street side.)Details
fire damage unit. windows repoalced are in kind windows not visible from street, remodeling living room, bedroom, kitchen, bathrrom. replace cabinets and sixtures, remove all of plaster wall and ceiling do electircal upgrade, plumbing and replace plaster (not on the street side.) | $11,500 |
| Mar 2, 2006 | Completed final sign-off Jul 2006 | 347 Divisadero St | work on 2nd floor, remodeling bathroom replace bathtub vanity sink, toilet, remodeling one kitchen replace sink, dishwasherDetails
work on 2nd floor, remodeling bathroom replace bathtub vanity sink, toilet, remodeling one kitchen replace sink, dishwasher | $22,700 |
| Dec 12, 2005 | Completed final sign-off Jul 2006 | 349 Divisadero St | remodeling two bathroom. one toilet room in residential units. remodeling 1 kitchen non structural.Details
remodeling two bathroom. one toilet room in residential units. remodeling 1 kitchen non structural. | $26,400 |
| Mar 12, 2004 | Completed final sign-off Jul 2004 | 2686 Bush St | remodel 3 units kitchen, replace new cabinet,new tile,new sink,repair damage plast ceiling @utilityDetails
remodel 3 units kitchen, replace new cabinet,new tile,new sink,repair damage plast ceiling @utility | $22,000 |